Nightly closures continue throughout the I-2 / I-69C Interchange Project corridor

PHARR – Additional full closures in Pharr and McAllen have been scheduled to take place this week for construction activities related to the I-2 / I-69C Interchange Project. Details are included below.


I-2 eastbound main lanes in McAllen

The I-2 eastbound main lanes between 2nd Street and McColl Road, in McAllen, will be closed nightly Wednesday, September 25 through Friday, September27, from 8PM to 6AM. Eastbound traffic will be diverted to the frontage road at the 2nd Street exit and use the next available entrance ramp to re-enter the main lanes.


I-69C southbound main lanes in Pharr

The I-69C southbound main lanes between Nolana Loop and SH495 will be closed overnight on Thursday, September 26, from 8PM to 6AM the following morning. During the closure, the southbound direct connectors from ‘Harlingen to Edinburg’ and ‘McAllen to Edinburg’ will not be accessible. Detour signs will be in place to direct motorists through alternate routes.


All work is weather permitting.

 

IN CASE YOU MISSED IT!


Details on additional closures taking place this week for the I-2 / I-69C Interchange Project are included below.

 

PHARR – Motorists traveling on westbound I-2 through Pharr, McAllen, and San Juan, and northbound I-69C in Pharr, should anticipate nightly delays, as mill and overlay operations continue. Various full closures and lane reductions will be in place for this work. Detour signs will be in place to direct motorists through alternate routes. Details are included below.


I-2 westbound main lanes in Pharr & McAllen


The I-2 westbound main lanes between Veterans Boulevard and Cage Boulevard, in Pharr, will be closed nightly Monday, September 23 through Sunday, September 29. The closure will take place Monday through Thursday from 8PM to 6AM, Friday and Saturday nights from 8PM to 8AM, and Sunday from 9PM to 6AM. During this closure, the westbound on and off ramps between Raul Longoria Road and Sugar Road will not be accessible, including the ‘Harlingen to Edinburg’ direct connector.


The I-2 westbound main lanes between the Sugar Road exit ramp in Pharr, and Jackson Avenue in McAllen, will be closed nightly starting Thursday, September 26 through Sunday, September 29. The closure will take place Monday through Thursday from 8PM to 6AM, Friday and Saturday nights from 8PM to 8AM, and Sunday from 9PM to 6AM. During this closure, the westbound on and off ramps between Sugar Road and Jackson Avenue will be closed. The ‘Edinburg to McAllen’ direct connector will not be accessible during this closure.


The I-2 westbound main lanes between the Jackson Avenue exit and 6th Street in McAllen, will be closed nightly Monday, September 23 through Wednesday, September 25 from 8PM to 6AM. During this closure the 2nd Street exit ramp and the entrance ramp west of Jackson Road will not be accessible.


I-69C northbound main lanes in Pharr

The I-69C northbound main lanes between SH495 and Nolana Loop, in Pharr, will be closed nightly, Monday, September 23 through Sunday, September 29. The closure will take place Monday through Thursday from 8PM to 6AM, Friday from 11PM to 7AM, Saturday from 9PM to 8AM, and Sunday from 9PM to 6AM. The northbound direct connectors from ‘Harlingen to Edinburg’ and ‘McAllen to Edinburg’ will not be accessible during this closure.


I-2 westbound frontage road in Pharr

Segments the I-2 westbound frontage road in Pharr will be closed nightly Monday, September 23 through Sunday, September 29, from 8PM to 6AM. The full closures will take place at the following locations:

  • Between Veterans Boulevard and Jupiter Street
  • Between Cage Boulevard and Sugar Road

Details on additional lane closures are included below.

Date

Time

Closure Details

Monday, September 23 -

Tuesday, September 24


Overnight,

8PM – 6AM


Right lane closure on the I-2 westbound main lanes between Raul Longoria Road and the Veterans Boulevard exit in San Juan


Left lane closure on the I-2 westbound main lanes between Cage Boulevard and Sugar Road

Monday, September 23 -Sunday, September 29

Nightly,

Mon. –Thurs., 8PM–6AM

Fri., 11PM – 7AM

Sat., 9PM – 8AM


Alternating lane closure on the I-2 eastbound main lanes between McColl Road in McAllen, and Jackson Road, in Pharr


Westbound entrance ramp west of Sugar Road


Eastbound entrance ramp east of Jackson Avenue and east of 2nd Street


Eastbound Jackson Road exit ramp

Traffic will be intermittently slowed throughout the project corridor nightly this week from 8PM – 6AM for maintenance operations.