Lane Closures, April 18-24
  • Alternating, single-lane closures in both directions on I-64 between I-664 north/Route 13/Route 58 (exit 299) and I-464 (exit 291), April 18-24, from 7 p.m. to 5 a.m.
  • Double-lane closure on I-64 east, between Great Bridge Boulevard (exit 292) and the foot of the High Rise Bridge, Tuesday, April 19, from 7 p.m. to 5 a.m.
  • Double-lane closure on I-64 east, between Greenbrier Parkway (exit 289) and I-464 (exit 291), April 19-22. from 7 p.m. to 5 a.m.
  • Motorists can expect a traffic shift on I-64 west between Great Bridge Boulevard (exit 292) and I-464 (exit 291), beginning as early as Friday, April 22, at 5 a.m. Traffic will be shifted to the outside lanes on to new pavement to allow for continued work in the median.
Exit to Great Bridge Boulevard (Exit 292) from I-64 west closed, Wednesday, April 20, from 7 p.m. to 5 a.m.

Motorists traveling on I-64 west towards Virginia Beach should follow detour signs utilizing:

  • Exit 291A to I-464 north
  • Exit 1 to I-64 east
  • Exit 291B to Route 168 south
  • Right exit to Great Bridge Boulevard

End detour on Great Bridge Boulevard
George Washington Highway (Route 17) north on-ramp to I-64 west closed, Tuesday, April 19 to April 26, from 9 p.m. to 5 a.m.

During this nightly closure, motorists should utilize the cloverleaf detour.
To view all project related traffic impacts, please visit the traffic alert section of 64highrise.org.
All construction schedules are pending, due to weather or unforeseen circumstances. Changes to the schedule will be updated on the project website traffic alerts page.
For information on lane closures necessary for maintenance and construction throughout Hampton Roads, drivers can visit 511Virginia.org, download the 511VA smartphone app, or dial 511.