MYEC Building
2417 West 29th Avenue
Denver, CO

TDEG's work at this location for the Denver Public School System is two phases. The first phase involved the review of the existing structure for the addition of two new units on the roof of a
pre-engineered metal building. Phase 2 involves the design of a new free-standing support frame that will extend through the roof to support the new RTU units. TDEG is pleased to be collaborating
with DLH Architecture on this project.

Architect: DLH Architecture, Castle Rock, CO