August 18, 2023

{View as Webpage}

Alderman Reilly Reports

Inn of Chicago & CPD Roll Call on Michigan Ave

As reported in Reilly Reports on July 28th,  Alderman Reilly has shared concerns and requested additional support from City Departments regarding migrants being housed at the Inn of Chicago, located at 162 East Ohio Street. Earlier this week, he also discussed expectations imposed on migrants staying at the shelter with ABC 7’s Sarah Schulte.  Click here to watch the segment.


Yesterday, Alderman Reilly attended a public Chicago Police Department (CPD) Roll Call to show his support for the good work our police officers do. The Roll Call took place at North Michigan Avenue and East Ohio Street. Please see below. 
 

Afterwards, officers immediately began their shift by patrolling near the Inn of Chicago, which has been the source of recent reports of narcotics sales, loitering, public intoxication, and lude behavior.

Chicago Air and Water Show

Presented by the Department of Cultural Affairs and Special Events, the Chicago Air and Water Show returns to North Avenue Beach and along the lakefront on Saturday, August 19 and Sunday, August 20 (10:30am to 3:00pm). 


The Chicago Air and Water show is the largest FREE show of its kind in the United States. The show can be viewed along the lakefront from Fullerton Avenue to Oak Street, with North Avenue Beach as the focal point.


The U.S. Air Force Thunderbirds have begun conducting practice flights in preparation of the show. Residents will be able to hear the drills they perform. There will be no street closures in the 42nd Ward associated with this event. 


Please click here to learn more about the Chicago Air and Water Chicago

CDOT Arterial Resurfacing Project: Ohio, from State to McClurg

Last week, the Chicago Department of Transportation began resurfacing East Ohio Street, from North State Street to North McClurg Court.


The work will include ADA sidewalk improvements, curb and gutter removal and replacement, milling and paving the existing asphalt pavement and striping.

 

During construction, temporary “No Parking” signs will be periodically installed as required for each activity listed above. These temporary signs will restrict parking during working hours, while adhering to rush hour restrictions, for the completion of the work. Majority of resurfacing work is estimated to be completed by August 31, 2023 and overall project completion to be September 30, 2023.

NASCAR Survey Closed

On August 11th, Alderman Reilly launched a survey to gather public input about the NASCAR Street Race that took place in July.  Thank you to the hundreds of individuals who took the time to provide feedback. 


Alderman Reilly takes constituent feedback very seriously. All of your comments will be read and carefully considered. Stay tuned to Reilly Reports for survey results and further information about the future of NASAR in Chicago.

Protected Bike Lanes

The Chicago Department of Transportation (CDOT) plans to extend the City's bike lane network by 150 miles, and 85% of those installations will be protected by concrete curbs. In addition to new bike lane installations, CDOT aims to improve existing protected bike lanes by replacing plastic bollards with concrete curbs. Please click here to review CDOT's bike lane plan. 


CDOT began installing concrete curbs along the Clinton Street Bike Lane, from West Harrison Street to West Fulton Street. Upon completion, CDOT will begin installing concrete curbs along the following protected bike lanes:


  • Randolph Street , from Canal Street to Michigan Avenue
  • Washington Street, from Wacker Drive to Michigan Avenue


Construction of these concrete curbs will be completed by the end of August 2023.

Randolph Street Viaduct Westbound Lane Closure: 8/21/23 - 9/1/23

As part of ongoing CDOT repairs at Randolph Street Viaduct, a temporary additional lane closure will go into place on Monday, August 21st at 7am until Friday, September 1st at 3pm.

 

Scope of Work:

The project consists of performing the following repairs: Bridge deck patching at 200 E. Randolph and 300 E. Randolph, upper level, outer west bound lane. 

 

Construction Schedule:

  • 7:00 am - 3:00 pm Monday, August 21st  until Friday, September 1st   - Bridge Deck Patching.


Traffic Impact during Construction:

 

  • The loading zone and bike lane at 300 E. Randolph upper level will be temporarily closed. 
  • The outer west bound traffic lane and bike lane at 200 E. Randolph upper level will be temporarily closed.
  • At least one west bound through lane will be maintained at all times with signage indicating a shared traffic lane for bicyclists and vehicles as necessary.
  • The current traffic configuration in the eastbound lanes of Randolph St. from Columbus Dr. to Field Blvd. will remain as is.
  • Intermediate level westbound traffic and bike lanes will be unaffected. 
  • At least one sidewalk will remain open to pedestrian traffic.

Canal Street Direction Change

During the community engagement process for the Cassidy Tire development project at 344 North Canal Street, residents expressed an interest in changing the direction of North Canal Street, between West Lake Street and West Kinzie Street from a two-way street to a one-way northbound thoroughfare. 


Based on feedback from local residents, the Alderman required the developer (Habitat) to fund a directional change pilot program for this stretch of North Canal Street. 


Alderman Reilly is pleased to announce that the one-way conversion is scheduled to take place the week of August 21, 2023. The pilot program will be in-place for one year. If it is successful, Habitat will fund a permanent directional change. 


Please see the flyer below for more details. 

CAPS Meetings

18th District: (312-742-5778 / CAPS018District@chicagopolice.org)

  • There are no scheduled CAPS meetings for this district in the month of August.

1st District: (312-745-4381 / CAPS001District@chicagopolice.org)

  • There are no scheduled CAPS meetings for this district in the month of August.

42nd Ward Traffic Closures & Construction Projects

Holden Alley Vault Project


The Joffrey Tower Condominium Association is conducting a vaulted alley project on Holder Alley, between East Randolph Street and East Benton Place. During the project, this section of Holder Alley closed to pedestrians and vehicles.


The project is expected to be completed mid-September.


Crane Lift: 40 East Erie Street


Stevenson Crane will conduct a crane lift at 40 East Erie Street on Wednesday, August 23, from 9am to 4pm. 


During the lift, the following will be closed:


  • Sidewalk on the north side of Erie, from Wabash to a point 100' east thereof
  • Curb lane on the north side of Erie, from Wabash to a point 100' east thereof
  • Two traffic lanes on Erie, from Wabash to a point 100' east there of


The curb lane on the south side of the street will be converted into an eastbound traffic lane during the lift. 


Crane Lift: 741 N Wells


Gatwood Crane was hired to lift construction materials onto the roof of 741 N Wells Street. This will take three days. They plan to conduct the lift on the following days:


  • Tuesday, August 22 - Crane set-up
  • Wednesday, August 23 - Lift day
  • Thursday, August 24 - Crane tear down


During the lift, the following will be closed:


  • Sidewalk on the east side of Wells, from Chicago to a point 200' south thereof
  • Curb lane on the east side of Wells, from Chicago to a point 200' south thereof
  • Traffic lane on the east side of Wells, from Chicago to appoint 200' south thereof


One lane of northbound traffic will be in place throughout the lift. Attached is their site diagram. 


Filming


Anonymous Content


Anonymous Content will be filming scenes for a TD Bank commercial titled Deep Dish at 430 N Michigan Avenue on Sunday, August 20. During the filming (7am-10pm), parking will be prohibited at the following locations:


  • Both sides of Hubbard from Michigan to Wabash.
  • Both sides of Rush from Kinzie to Illinois.
  • Both side of Kinzie from Wabash to State.
  • Both sides of Lower Wabash from Kinzie to Illinois.
  • Both sides of Lower Michigan from Hubbard to Illinois.
  • South side of North water Street from Lower Michigan east 300ft.


If you have any questions or concerns, please call Valerie Bulinski- 312 623-6989 or Jim Turner 312-420-6413.


Grand Avenue Bridge Project:


The Chicago Department of Transportation is replacing the black rubber mats on the sidewalks on both sides of the Grand Avenue Bridge. Repairs are expected to be completed by mid-August.


PGL River North Project


Peoples Gas plans to begin a gas main project in River North. PGL will be working at the following locations:


  • Franklin, from Huron to Chicago
  • Superior, from Wells to Orleans
  • Chicago, from Orleans to LaSalle


The project is expected to begin at the end of July. It will be completed at the end of 2023.


15 E Oak Street: Facade Project:


Early this week, a facade project began at 15 E Oak Street. Throughout the project, the sidewalk on the south side of Oak, from State to Rush will be closed. A protected pedestrian walkway will be in-place in the curb lane.


The project is expected to be completed October 2023.


120 E Oak Street Facade Project


Summit Design + Build will begin a facade project at 120 E Oak Street on Tuesday, May 30. Works hours will be Monday thru Saturday, from 8am-5pm.  


Throughout the project, the sidewalk adjacent to the building will be closed. It will be covered by construction fencing. Pedestrians will be pushed to a protected pedestrian path in the curb lane.


Deliveries will occur between before 9am and debris will be removed between 8am-9am. There will be a gate at the east end of the fencing for deliveries and debris removal.


The project will be completed in early November.


Peoples Gas Project: Clark and Adams


PGL began work on Clark (Monroe to Jackson) and Adams (LaSalle to Clark) earlier this month. There will be temporary lane closures on Clark and Adams during permit hours but traffic will be maintained at all times


Work days/hours are Monday-Saturday, from 8am-5pm. This project is expected to be completed in October 2023.


Murphy Auditorium Renovation


Driehaus Museum purchased the Murphy Auditorium at 50 E Erie and plans to begin renovations in June. Work hours are Monday-Friday, from 8-4pm. They plan to complete the following interior alterations:


  • Offices are going to be renovated
  • Stage has sunken – leveled out; fix accessibility issue
  • New elevator to go all the way to the top floor


Throughout the project, the following will be in-place:


  • Pedestrian canopy over the sidewalk in front of 50 E Erie
  • 100' of curb lane will be closed in front of 50 E Erie for material deliveries and small crane


They will need to use a small crane periodically throughout the project to lift materials onto the roof that can't fit through the doorway. Driehaus will notify us in advance of installation of a small crane. 


Dearborn Street Bridge:


Due to equipment and material procurement problems, the Dearborn Street Bridge project will be completed in September 2023 (weather dependent). One lane of traffic will remain open at all times.


431 N Dearborn Façade Project


Crane construction began a façade project at 431 N Dearborn this week. Throughout the project, the sidewalks adjacent to the building on Dearborn and Hubbard will be closed. Pedestrians are directed to walk in projected pedestrian walkways in the curb lanes.


The project is expected to be completed in October 2023 (weather dependent).


225 W Randolph Renovation:


The Onni Group began renovating 225 W Randolph. Throughout the project, there will be pedestrian canopies at the following locations:


  • South side of Randolph, from Franklin to the first alley east thereof
  • East side of Franklin, from Randolph to the first alley south thereof


This project is expected to be completed July 2024.



151 N Michigan:


Power Construction installed a tower crane on Beaubien Court for the project at 151 N Michigan Avenue. While the crane is in place, Beaubien Court, from a point 23' north of Randolph Street, to a point 100' north thereof will be closed to vehicular traffic. The crane will be in-place for 8-10 weeks.


The following will be closed throughout the duration of the project:


  • Sidewalk on the north side of Randolph, from Beaubien Court to Michigan Avenue
  • Sidewalk on the east side of Michigan, from Randolph, to a point 100' north thereof
  • Beaubien Court, from Randolph to a point 100' north thereof


Pedestrians will be directed to use projected walkways that are placed in the curb lanes on Randolph and Michigan. The project is expected to be completed at the end of 2023.


Temporary Bus Stop Elimination


Until March 2024, the westbound bus stop at Grand and St. Clair will be temporarily removed.


  • Stop ID Number: 761
  • Route Stopping: #29 – State, #65 – Grand, #120 – Ogilvie/Streeterville Express, #121 – Union/Streeterville Express


Randolph Street Viaduct Repair


CDOT will be performing repairs at Randolph Street Viaduct (East bound lanes only) between Columbus Dr. and Field Blvd.

 

Scope of Work:

The project consists of performing the following repairs: Concrete deck repairs, street paving.


Construction Schedule:

7:00 am - 6:00pm Monday to Saturday, April 10th  - September 30th 2023.

No demolition or other excessive noise creating activity will begin until after 8:00am.

 

Traffic Impact during Construction:

 

  • The Randolph Street Viaduct east bound lanes will have one lane open to traffic at all times and one lane closed for construction at both the upper and intermediate levels between Columbus Dr. and Field Blvd. At least one sidewalk will remain open to pedestrian traffic.
  • All parking on east bound Randolph St. will be removed between Columbus Dr. and Field Blvd.
  • West bound lanes will be open at all times during construction with the exception of single night closures (Dates are TBD and updates will be provided).
  • Access to Millenium Parking Garage and Maggie Daley Park will be limited to entrances at the Columbus Dr./Randolph St. Intersection and Field Blvd./Randolph St. Intersection. Elevator/ADA access to the garage will be maintained.


State & Lake Utility Relocations


Utility companies began relocating utilities in advance of the State and Lake CTA project. Train services will not be disrupted during utility relocations. 

 

At least 1 lane of traffic will remain open (1 lane each direction on State St) at all times, but other driving and parking lanes may be closed. 


Construction equipment and materials will be stored on the street, including during time periods between active work. Work will primarily occur 9:00 AM to 4:00 PM on weekdays and 8:00 AM to 8:00 PM on Saturdays, but there will be limited work during nights. Utility companies are aware of and required to abide by the Chicago noise ordinance, which limits noisy work during overnight hours.


150 E Ontario Construction


W.E. O'Neil began construction of a 23-story building at 150 East Ontario Street. Work hours will be Monday-Friday, from 9am-5pm (8pm during caisson pours). Some weekend work will occur.  


Throughout the project, the following will be closed:


  • 150' of sidewalk in front of 150 East Ontario
  • 150' of curb lane in front of 150 East Ontario 


Pedestrians will be directed to the sidewalk on the south side of the street at Ontario/Michigan and Ontario/St. Clair. The entire project is expected to take 23 months to complete. 

 

Chase Tower Clark Street Tunnel Project


In mid-July, Berglund Construction began repairs on the Chase Tower Clark Street tunnel at 23 S. Clark Street. The project scope consists of repairing Chase’s below-grade tunnel structures that cross below Clark Street at 23 S. Clark St, and will require excavation of Clark Street in that area to access the tunnel structures to perform repairs.


There will be one lane of southbound traffic open at all times. Berglund will have flaggers and barricades in-place throughout the project. 


The project will last 26 months. Berglund would like to begin mid-June. Work hours will be Monday-Friday, from 8am-5pm.


535 N. St. Clair Street Project


Demolition of 535 N St. Clair is completed. LendLease has mobilized for construction and they have began pouring caissons. Throughout the project, there will be a protected pedestrian canopy on the north side of Grand, from St. Clair to a point 100' east thereof. The entire project is expected to be completed at the beginning of 2024.


Cassidy Tire Construction 


Construction of the 33-story mixed-use building is underway. Throughout construction, McHugh Constriction will occupy the curb lane on the west side of Canal along 344/350 N. Canal Street's property line. The construction company has leased the area north of the building from the railroad to use as a staging area. Additionally, they will use the parking lot south of the building as a staging area too.


As a reminder, this project is contributing to numerous public benefits. Click here for a list of public benefits, and stay tuned to Reilly Reports for future updates on this project and the implementation of these public benefits.  All work is expected to take 24 months to complete (weather dependent).


311 W Huron Project


In June, ARCO Murray began construction of a new building at 311 W. Huron Street. Work hours will be Monday-Friday, from 9am-5pm (8pm during caisson pours). Throughout the project, the following City right-of-way will be occupied:


  • Sidewalk/curb lane on the south side of Huron, from Franklin west to the end of 311 W Huron's property line - approximately 150'. The sidewalk will be used to store their concrete pump, dumpster, and hoist dock. Trucks will back into the site at this location too. Jersey barriers will be placed in the curb lane to create a protected pedestrian path.
  • 3' of the sidewalk on the west side of Franklin, from Huron to the first alley south thereof. This leaves 6' of clearance. They will need to push the fence out a few feet during excavation.
  • 150' of the east/west alley bounded by Huron, Franklin, Erie, and Orleans will be closed. The closure is from Franklin to a point 150' west thereof. 


The project is expected to be completed in September 2023 (weather dependent). 


214 West Erie Street Renovations


On Monday, December 13, Crane Construction began renovations of 214 West Erie Street. During construction, the following will be closed:


  • Sidewalk/curb lane in front of 214 West Erie Street. The curb lane will be used as a pedestrian walkway. Crane Construction will place jersey barriers and ramps in the curb lane to protect pedestrians and provide wheelchair access. 
  • Close 100' of the north/south alley adjacent to 214 W Erie Street. This is a T alley and residents of 222 W Erie will still be able to access their parking garage from the alley entrance on Franklin and Huron.


This project is expected to be completed in early 2023 (weather dependent).


LG Construction: 751 N. Hudson and 451 W Chicago 


LG Construction continues work on 751 N. Hudson Avenue and 451 W. Chicago Avenue, which are adjacent parcels. Work hours will be 8am-5pm, Monday-Friday.

 

Throughout the project, the following will be closed:


  • Sidewalk/curb lane/traffic lane of the east side of Hudson, from Chicago to the first alley south thereof
  • Sidewalk/curb lane/traffic lane on the west side of Sedgwick, from Chicago to the first alley south thereof
  • Sidewalk/curb lane on the south side of Chicago, from Hudson to Sedgwick


There will be a protected pedestrian walkway in the curb lane on the south side of Chicago Avenue, from Hudson Avenue to Sedgwick Street.


This project is expected to take 18 months to complete (weather dependent). 


354 North Union Construction


The Onni Group is constructing a 33-story residential building with 373 units. Work hours will be 8am-8pm, daily. 


Parking will be prohibited on North Union, from West Kinzie to the cul-de-sac west thereof throughout the project. All construction equipment and vehicles will be staged on the Onni Group’s property. This project will take approximately two years to complete. 


Street Sweeping


During street sweeping season (April 1 to mid-November) the Chicago Department of Streets and Sanitation uses mechanical street sweepers to remove debris and litter from streets, weather permitting. Throughout the season, DSS deploys mechanical street sweepers at regularly scheduled times to clear debris from Chicago streets. Starting this week, dozens of street sweepers have begun clearing the debris and leaves that have accumulated during winter months on both residential and arterial streets. 


On weekdays, from 9am to 2pm, this Sweeper Tracker map will show real-time locations of city street sweepers. For more information, please review the 42nd Ward Map and street sweeping schedule. Residents can also call 311 to find the dates and locations of street sweeping in their area.


Please check for the bright orange signs announcing temporary parking restrictions. These signs are posted two days prior to scheduled street sweeping events. Some streets also have permanently posted signs that specify a once-per-week period when parking is prohibited for street sweeping.


Kennedy Expressway Bridge Rehabilitation


The Illinois Department of Transportation (IDOT) began rehabilitation of the Kennedy Expressway (Interstate 90/94), from the Edens Expressway (Interstate 94) junction to West Ohio Street


The project consists of rehabilitating 36 bridge structures and the Reversible Lane Access Control (REVLAC) system, replacing overhead sign-structures, installing new signage and modernized LED lights, pavement patching and structural painting. Additionally, Hubbard’s Cave, from Grand Avenue to Wayman Street, will be painted and new LED lighting installed.


This project will take place over three consecutive construction seasons and consist of three stages. The following will occur during stage one:


Stage I - Inbound Kennedy


To help minimize the impact to traffic the reversible express lanes will remain open in the inbound direction, while two mainline inbound lanes will be closed at a time. Motorists should expect lane shifts and overnight lane closures and various ramp closures. Later this summer, painting and installation of new LED lighting will begin on inbound Hubbard's Cave, between Ohio and Lake streets. Construction is anticipated to be completed later this fall, with all lanes and ramps reopening and the express lanes resuming normal operations.


Please click here to learn more about the Kennedy Expressway Bridge Rehabilitation, and stay tuned to Reilly Reports for future updates.