October 2026

Momentum You Can See

A retail center transformed. A Detroit landmark reimagined. A growing team building what comes next.

 
Email  Facebook  Instagram  LinkedIn  Web  YouTube
 
 

FARMINGTON HILLS, MI

From Redevelopment to Retail Reality at Hunter's Square


A shopping center doesn't transform overnight but if you've driven past Hunter's Square in Farmington Hills lately, it might feel that way.


Last month, RH Outlet became the first completed piece of the redevelopment to open its doors, giving shoppers a preview of what the rest of the center is becoming. Around it, the transformation is still very visibly underway: steel going up, storefronts taking shape, and, in one of our favorite moments from the site this year, a helicopter lowering HVAC units onto the new Meijer roof.


It's easy to talk about a project like this in terms of square footage and timelines. But the more interesting story is what it actually takes to turn an aging shopping center into a new retail destination while pieces of it are already opening around you. Tenants moving in, customers showing up, and construction continuing just a few doors down.


That balancing act is exactly what's playing out at Hunter's Square right now. And there's more to come: Symmetry Management recently welcomed Nordstrom Rack as a new addition to the center, a 25,000-square-foot store set to open in fall 2027 alongside existing tenants like DSW, Ulta, Meijer, and Old Navy.

undefined
undefined

1st

RH OUTLET OPEN

25,000 SF

NORDSTROM RACK

2027

OPENING TARGET

 

"Symmetry Management is pleased to welcome Nordstrom Rack as a key entry into the Hunter's Square development. Their arrival signifies a major milestone in our vision for the site and reinforces Hunter's Square as a premier retail destination in the market.”


— FRANK JARBOU, CEO & PRESIDENT, SYMMETRY MANAGEMENT

 
 

CAREERS IN CONSTRUCTION MONTH

Choose Your Character


October is Careers in Construction Month — a nationwide effort to raise awareness of the career paths available in our industry, at a moment when the industry needs them more than ever. A recent AGC/NCCER survey found that 82% of construction firms have salaried openings right now, and most say those roles are harder to fill than they were a year ago.


Ask most people to picture a construction career, and they'll picture one thing: someone in a hard hat on a job site. The reality is a lot bigger than that. Building a project takes superintendents and project managers, estimators and project engineers, safety directors and accountants, marketing and business development professionals...a whole team of people whose jobs look nothing alike but who are all, in their own way, building something.


At JRC, that team keeps growing. Here are four paths into the work, in the words of the people doing it.


Garrett Dulecki · Estimating

“I chose to join the JRC estimating team because I genuinely enjoy understanding how things go together and problem solving along the way. Jarbou Ronnisch has a history of working on all kinds of projects. Working in estimating allows me to dive into the means and methods of various construction types. The combination of the right company and the right focus has brought me much joy in my work!”


Kyle Crane · Project Engineer

“I've always liked working in an industry where you can actually see the result of the work you put in. As a Project Engineer, no two days are really the same. I'm constantly working with the project team and trades to solve issues, keep things organized, and help keep the project moving forward.”


Hunter Taylor · Senior Estimator

“I chose my path in preconstruction because I love seeing an idea become reality. When an owner shows me a run-down building or a vacant piece of land and shares their vision, it's rewarding to work with them from the beginning and help turn that vision into something real.”


Cooper Nordeen · Superintendent

“As a superintendent, I have the opportunity to be involved in the large-scale planning and management of projects while remaining immersed in the day-to-day rigor and excitement of the jobsite. As someone who is strongly motivated by tangible progress, I enjoy witnessing the significant strides our crews make each day.”


We're growing because our work is growing and right now, that includes an opening for a mid-level Project Manager. If you know someone who builds well with people as much as they build with steel and concrete, we'd love an introduction.

 
 
 
 


BUILT FOR DETROIT

More Than Building in Detroit


JRC's presence in Detroit isn't limited to job sites. Last month, Frank Jarbou joined developers Zaid Elia, Todd Sachse, and Sam Surnow at the Metro Detroit Real Estate Forum to talk development and collaboration across the city's real estate community.


Around the same time, JRC served as a Platinum Sponsor of AIA Detroit's Celebration of Architecture, Michigan's largest annual gathering of architecture, engineering, and construction professionals. Two events, one theme: JRC isn't just building in Detroit, we're part of the conversation shaping what comes next.



DETROIT, MI • EASTERN MARKET

Old Buildings. New Purpose.


Tearing a building down is, in a lot of ways, the easy option. Saving one by keeping its bones, its character, its place in a neighborhood's memory is almost always the harder path. It's also often the more valuable one.


That's the story behind our newest Detroit project: the adaptive reuse of the historic Busy Bee building at Gratiot and Russell, at the gateway to Eastern Market. JRC is serving as general contractor on the transformation of the century-old property into a mixed-use development with 17 apartments and more than 6,500 square feet of ground-floor retail.


Adaptive reuse isn't simple. Old buildings come with surprises like structural quirks, outdated systems, layouts that were never designed for how the space will be used next. It takes a different kind of construction expertise than building on a clean site: part construction management, part detective work, part respect for what's already there.


But the payoff is a building that couldn't be replicated new. One with a history already built into its walls, now serving a new generation of Eastern Market residents and neighbors.

 
 
 

FROM THE FIELD • SAGINAW, MI

A Headquarters Starts Feeling Like Home


Progress at Team One Credit Union's new Saginaw headquarters has reached the stage every project team looks forward to...when a construction site starts looking like the building the client actually imagined.


Drywall is nearly complete throughout the 28,000-square-foot, three-story facility. Windows are in. The full-service retail branch, collaborative workspaces, and 2,400-square-foot community room are all starting to take shape rather than exist only on a plan sheet.


JRC is serving as general contractor on the project, designed by AKA Architects, with completion targeted for late 2026. A meaningful milestone for a credit union marking 90 years of serving the Saginaw community.

INDUSTRY INSIGHTS

When Costs Move, Planning Matters More


Construction costs are still climbing. Input costs for new nonresidential construction were up 8.9% year-over-year as of August, driven in part by increases in metals and petroleum-related products, according to the Associated General Contractors of America.


That's the kind of headline that makes owners nervous and understandably so. But the more useful question isn't “how much are costs rising.” It's: what can an owner actually do about it?


A few things help more than people expect:



  • Early budgeting. The earlier real cost data enters the conversation, the fewer surprises later.
  • Constructability reviews. Catching design conflicts and sequencing issues before they become change orders.
  • Smart procurement. Locking in pricing or materials earlier when volatility is high.
  • Built-in alternates. Giving a project room to flex on finishes or scope without losing momentum.
  • Bringing the contractor in early. Preconstruction input from the team that will actually build the project tends to catch what a purely design-driven budget misses.


None of this makes rising costs disappear. But it's the difference between a project that absorbs volatility and one that gets derailed by it and it's exactly the kind of planning JRC's preconstruction team works through with owners before the first shovel goes in the ground.