Monument Junction Project D (Jackson Creek Parkway

between Highway 105 and just north of Slopeside Street)

Project Update

Week of July 7, 2025

Storm line construction on south side of Highway 105 at the intersection

with Jackson Creek Parkway begins this week

Storm line construction work on the south side of Highway 105 at the intersection with Jackson Creek Parkway is scheduled to begin this week, weather and resource dependent. 

 

This work, being done by the Monument Junction Metro District, is for the storm line that runs from Highway 105 south under the future retaining wall. After completing the storm line work associated with the retaining wall, crews will then begin work in the Colorado Department of Transportation right-of-way. 

 

Concrete barrier traffic control for this project are already in place. Construction work will occur inside that barrier wall. There will be no access restrictions to businesses.

 

Watch for trucks entering/exiting the construction area and for reduced speeds during construction. Use caution in the construction zone.

 

Paving of the project is not anticipated until late this year.

Construction equipment lined up for storm line work on the south side of Highway 105 at the intersection with Jackson Creek Parkway.

Project Description


Construction by the Monument Junction Metro District’s contractor, Wildcat, is underway to support the Monument Junction development. This is the ultimate build-out of the intersection at Jackson Creek Parkway & Highway 105. The Jackson Creek Parkway Interim work previously completed was tied directly to Monument Junction for access to both.


Completed Work:

  • Major fiber duct lowering at the Lumen Central Office
  • Black Hill Energy gas relocation
  • Mountain View Electric line relocation
  • Lumen fiber duct lowering
  • Woodmoor sanitary sewer line relocation
  • Signalization at Fat Tire Drive
  • Traffic delineators installed on Highway 105 eastbound for the right turn southbound on Jackson Creek Parkway


Project Phase 1 construction:

  • Retaining wall construction on the east side of Jackson Creek Parkway and Highway 105
  • Storm line work on Highway 105 – underway

 

Project Phase 2 construction: 

  • Jackson Creek Parkway northbound dual left turn lanes onto Highway 105
  • Highway 105 westbound dual left turn lanes onto Jackson Creek Parkway
  • Highway 105 eastbound right turn lane onto Jackson Creek Parkway
  • Traffic signalization

Stay Informed

For more information about the Jackson Creek Parkway Widening project, visit our website HERE


Send an email asking to receive project updates to: JacksonCreekParkway@gmail.com