In May, crews continued construction activities along the corridor:
Area 1: Reston Avenue to Colvin Forest Drive (Except Baron Cameron Avenue Intersection)
Area 1 West: Reston Avenue to Baron Cameron Avenue
- Starting drilling for noise barrier foundations along eastbound Route 7 between Reston Parkway and Bishopsgate Way.
- Continued paving and median curb construction between Utterback Store Road and Baron Cameron Avenue.
Area 1 East: Baron Cameron Avenue to Carpers Farm Way
- Completed post and panel installation for noise barriers along westbound Route 7 between Colvin Run Road (west) and Downey Drive, continued noise barrier panel installation between the two Colvin Run Road intersections.
- Installed the arch sections and wingwalls for the north half of the pedestrian underpass at Colvin Run Mill Park.
-
Completed storm sewer installation and began pavement construction for Stage 3A between Baron Cameron Avenue and Colvin Forest Drive.
Area 2: Baron Cameron Intersection
- Continued storm sewer installation, grading, stone placement, and paving at the Baron Cameron Avenue intersection.
- Reconstructed the right-turn lane from westbound Route 7 to Springvale Road.
- Shifted the left-turn and through lanes of westbound Route 7 to the north.
Area 3: Difficult Run Area (Colvin Forest Drive to Faulkner Drive)
- Completed girder installation and began constructing the deck of the eastbound Route 7 bridge over Difficult Run.
Area 4: Faulkner Drive to Jarrett Valley Drive
- Continued noise barrier construction along eastbound Route 7 near between Serenity Woods Lane and Middleton Ridge Road.
-
Continued storm sewer installation, earth-moving, and road construction activities in preparation for the upcoming opening of the displaced left-turn lane at Lewinsville Road.
Third-party utility design and relocation activities are also ongoing.