June

2022

Newsletter

gmep.jpg

PCBC Summer Trade Show


We are excited to be exhibiting again at this year's summer showcase. GMEP will be at booth 1838. We hope to see you there!


Scroll to the bottom for your free guest pass!

Have you eaten at Puesto in Bella Terra, Huntington Beach?!


PUESTO - HUNTINGTON BEACH

GMEP Engineers provided the mechanical, electrical, and plumbing designs for this 7,400 square foot restaurant, including a 2,400 square foot patio. This restaurant is the 3rd location in Orange County for the award-winning San Diego-based eatery. Known for its trophy tacos and perfect margaritas, this location creates a unique dining experience based upon the outdoor Huntington Beach vibe. Our team took part in the careful and precise coordination of this project to ensure this vision could be achieved.  

Puesto.jpg
2021-08-23 _1_.jpg

MECHANICAL ENGINEERING DESIGN


The mechanical design included (5) 10-ton and (1) 5-ton roof packaged heat pumps as well as (7) type 1 hood systems. Coordination with the lighting and ceiling features while maintaining an even air distribution was a key factor in optimizing design visions without sacrificing performance. This location also includes several folding windows and doors which create a unique building envelope. GMEP Engineers modeled these components to ensure that energy efficiency standards were met. 

2021-09-10 _4_.jpg
2021-09-10.jpg
2021-09-10 _1_.jpg

ELECTRICAL ENGINEERING DESIGN


Our electrical design for the space included a 1,600 amp 3-phase electrical service to power all the equipment and lighting, and T-24 energy calculation certificates for the indoor lighting. This space includes a dedicated electrical room located on a mezzanine above the kitchen. The configuration of this room prompted multi-trade coordination to avoid conflicts and also creative thinking to provide solutions to mitigate the heat generated inside the room.  

2021-09-10 _5_.jpg

PLUMBING ENGINEERING DESIGN


The plumbing design system included a series of condensing tankless water heaters to serve the hot water system, a 4,000-gallon grease interceptor for the kitchen, and underground plumbing to serve the fixtures at the main bar without adding imposing structural elements. 

2021-08-23 _2_.jpg
2021-09-10 _2_.jpg

The location in Bella Terra is one of two Puesto projects that GMEP Engineers has worked on with Architects Orange. The other location is in Anaheim, CA, that was also recently completed and built. 

JOIN US AT THE NEXT TRADE SHOW

Are you coming to PCBC?

LOCATION

Moscone Center | San Francisco, CA

DATE AND TIME

06/22/22 8:00am - 06/23/22 4:00pm US/Pacific
The Future of Home - Summer Trade Show
I'll Be There!
I Can't Make It
I'll use the link below for a free guest pass!
Capture.PNG
Why not work with one consultant for four major design elements?
REQUEST A QUOTE TODAY

Our emphasis on practical and cost-effective design distinguishes us from our competition. Always committed to meeting your goals and deadlines, we are confident that we are the right choice for your project.


As always, please reach out with any questions or RFPs. We look forward to hearing from you!


Until next time,


Your friends at GMEP Engineers

Facebook  Twitter  Instagram  Linkedin  

DIDN'T CATCH US LAST MONTH?

Read the May newsletter here!

You are receiving this email because you have worked with us in the past, subscribed through our website, or corresponded with a GMEP employee at one time or another. We are happy to have you, but if you'd prefer not to receive our newsletter, you may easily unsubscribe using the link below.