KGE performed onsite engineering with Electrical Contractor (TEI) to produce the perfect solution during a switch gear replacement at a senior living community. Due to the importance of non-interrupted power and the duration of the job, two 625kva units were deployed. KGE paralleled both units feeding multiple temporary distribution panels, and transformer to step down voltage to other distribution panels before feeding multiple levels. |