These lane reductions are estimated to be in place into 2026, and additional traffic shifts will occur as the Hampton River bridges undergo construction.
Visit the project site to learn more about construction updates, traffic impacts and to sign-up to receive project updates: https://64expresslanes.org/under_construction/hampton.asp
Motorists are encouraged to use I-664 as an alternate route to avoid the work area when possible and are reminded to use caution when traveling near work zones, obey posted speed limits, be alert to digital message signs and drive distraction-free.
The HREL Hampton Segment will ultimately become a part of the overall HREL Network, a continuous, 46-mile network of Express Lanes in each traffic direction on I-64, from east of Denbigh Boulevard in Newport News to the I-64/I-264/I-664 Bowers Hill interchange in Chesapeake. The HREL Network is designed to transport more motorists through the region while helping to alleviate congestion and allowing motorists more travel options.
Motorists should plan their drive with VDOT’s free traffic information tools:
Download the 511Virgina app.
-
Visit the 511Virginia website or dial 511 for traffic information on your phone.
-
Follow @511hamptonroads on Twitter for traffic updates in the Hampton Roads area.
(END)
|