September 3, 2019
Your News from Lancaster City Schools...
Tallmadge Wins ODE PBIS Award

Walk through the halls at Tallmadge Elementary and you will learn all about "R-R-S" (you may even hear the children happily shouting it out with Mr. Campbell!). By instilling a culture of responsibility, respect, and safety, the hard-working staff and students at Tallmadge reinforce the good behavior and family atmosphere that makes our schools #theplacetobe for learning, caring, and succeeding!
Teacher Professional Development

Students stayed home last Friday, giving the teachers at Lancaster City Schools a chance to learn from one another and share their ideas. Lancaster City Schools is committed to helping our educators maintain and sharpen the skills that make their classrooms the best possible learning environments for our students, and it's another way that LCS is #theplacetobe for learning, caring, and succeeding!
Ways to Connect with LCS

At Lancaster City Schools keeping parents up-to-date with district information is an important part of our mission. Here are some ways that parents can stay tuned in with what's going on at LCS.
Junior High Construction Update

At Thomas Ewing, ceiling tile and hallway flooring is being installed in the single story classroom section of the building along with final coat of paint installation. Gymnasium backboards, wrestling mat hoist, and scoreboards are being installed. The cooler/freezer has been installed in the kitchen. In the two story classroom section, the elevator car is being installed and the final coat of painting has begun. Throughout the building, tech closet racks, temperature control wiring, electric devices, fire alarm devices, restroom fixtures, and restroom ceramic tiles are being installed and HVAC system testing has begun. On the exterior, rear sidewalks and road widening continue.  

At General Sherman, windows are being installed in the single story classroom section of the building and domestic water pipes are being installed in the main entrance section. In the two story classroom section, exterior brick and interior drywall are being installed. HVAC pipes, sprinkler pipes, electric feeder lines, and electric conduit are being installed in the gymnasium section. On the athletic fields, the track has been roughed in and topsoil is being re-spread.
UPCOMING EVENTS:
September 4: LEA Executive Board Meeting (Secondary Members @3:15pm, Primary Members @4:00pm) | LEA Office

September 18: LEA Executive Board Meeting (Secondary Members @3:15pm, Primary Members @4:00pm) | LEA Office

September 24: Regular Board Meeting @4:30pm | 111. S. Broad St. Large Meeting Room

September 26: Interim Reports sent to Parents

September 26: Special Ed Liaison Committee Meeting @4pm | Stanbery Board Conference Room
Contact Info: