495 NEXT LANE CLOSURES & TRAFFIC CHANGES

May 2 - May 10, 2025

The following construction-related lane closures and traffic changes are planned in the I-495 Express Lanes Northern Extension (495 NEXT) project corridor. Travelers may encounter delays in this area. All work is subject to change based on weather and other factors.


Visit 511.vdot.virginia.gov for information on work zones and lane closures.

495 NEXT Project Area Map

495 NEXT Project Area Map

Upcoming Highlights

  • I-495 North and South – Daytime single and multi-lane closures and nighttime multi-lane closures, stoppages and ramp closures with detours
  • George Washington Memorial Parkway – Daytime shoulder closures, nighttime ramp closures with detours and/or stoppages
  • Live Oak Drive –Daytime flagging operations with Saturday work and extended hours, 7 a.m. to 7 p.m.
  • Balls Hill Road, Lewinsville Road and Old Dominion Drive – Daytime flagging operations
  • Georgetown Pike – Daytime single lane closures and nighttime ramp closures with detours
  • Dulles Toll Road and Dulles Airport Access Highway  Daytime single lane closures and nighttime ramp closures with detours


Northbound I-495 Traffic Shift to New Beltway Alignment


On Friday night, May 9, into Saturday morning, May 10, crews are scheduled to shift traffic on all four general-purpose lanes of northbound I-495 (Capital Beltway Inner Loop) from just south of Old Dominion Drive to the George Washington Memorial Parkway onto new lanes built on the outer side of the highway.


One lane will remain open to traffic, except when intermittent total traffic stoppages and/or slow-roll traffic operations occur between midnight and 5 a.m. Police will be on hand to assist with directing motorists.


Click here for more information about the upcoming traffic shifts.

Lane Closures by Location

I-495 (CAPITAL BELTWAY) IN VIRGINIA

Dates

Time

Direction

Description

Limits

Reason

5/2/25

(F)

10 p.m. – 8 a.m.

Southbound

Single right lane closure

George Washington Memorial Parkway to Georgetown Pike

Moving barrier

5/2/25 & 5/4/25

(F & Sun)

10 p.m. – 5 a.m.

Northbound

Double right lane closure

Old Dominion Drive to George Washington Memorial Parkway

Paving work

5/2/25 & 5/4/25

(F & Sun)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

Northbound I-495 exit to GWMP (Exit 43)

Paving work

5/5/25 – 5/8/25

(M-Th)

10 a.m. – 3 p.m.

Northbound

Single right lane closure

Dulles Toll Road to George Washington Memorial Parkway

Road widening work

5/5/25 – 5/8/25

(M-Th)

9:30 a.m. – 2:30 p.m.

Southbound

Single right lane closure

George Washington Memorial Parkway to Dulles Toll Road

Road widening work

5/9/25

(F)

10 a.m. – 12 p.m.

Northbound & Southbound

Single mobile lane closure

George Washington Memorial Parkway to Dulles Toll Road

Road maintenance work

5/10/25 & 5/11/25

(Sat & Sun)

7 a.m. – 10 a.m.

Northbound

Single lane closure


More information

Dulles Toll Road to George Washington Memorial Parkway

Northbound traffic shift

5/5/25 – 5/8/25

(M-Th)

9:30 p.m. – 5 a.m.

Northbound & Southbound

Multi-lane closures with stoppages on SB on Wednesday night

Dulles Toll Road to George Washington Memorial Parkway

Paving, bridge beam erections, bridge demolition, pier and overhead sign work

5/5/25 – 5/8/25

(M-Th)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

Northbound I-495 exit to GWMP (Exit 43)

Paving work

5/9/25 & 5/10/25

(F & Sat)

8 p.m. – 8 a.m.

Northbound

Multi-lane closures with stoppages and/or slow-roll operations


More information

Lewinsville Road to George Washington Memorial Parkway

Northbound traffic shift

I-495 (CAPITAL BELTWAY) IN MARYLAND

Dates

Time

Direction

Description

Limits

Reason

5/4/25

(Sun)

9:30 p.m. – 5 a.m.

Northbound & Southbound

Multi-lane closures

Cabin John Park to American Legion bridge

Overhead sign work

5/5/25 – 5/8/25

(M-Th)

9 a.m. – 3 p.m.

Northbound & Southbound

Right shoulder closure

Cabin John Park to American Legion bridge

Cabling work

5/5/25 – 5/8/25

(M-Th)

9 a.m. – 3 p.m.

Southbound

Single left lane closure

Cabin John Park to American Legion bridge

Cabling work

5/5/25 – 5/8/25

(M-Th)

9:30 p.m. – 5 a.m.

Northbound & Southbound

Multi-lane closures

Cabin John Park to American Legion bridge

Overhead sign work

GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) INTERCHANGE

Dates

Time

Direction

Description

Limits

Reason

5/4/25

(Sun)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

GWMP on-ramp to southbound I-495

Paving work

5/5/25 – 5/8/25

(M-Th)

9:30 a.m. – 3 p.m.

Northbound

Right shoulder closure

GWMP on-ramp to northbound I-495

Cabling work

5/5/25 – 5/8/25

(M-Th)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

GWMP on-ramp to southbound I-495

Paving work

LIVE OAK DRIVE

Dates

Time

Direction

Description

Limits

Reason

5/5/25 – 5/10/25

(M-Sat)

7 a.m. – 7 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Langley Swim and Tennis Club to Green Oak Drive

Paving and road work

BALLS HILL ROAD

Dates

Time

Direction

Description

Limits

Reason

5/5/25 – 5/8/25

(M-Th)

9 a.m. – 3:30 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Benjamin Street to Live Oak Drive

Trail work

5/9/25

(F)

9 a.m. – 2 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Benjamin Street to Live Oak Drive

Trail work

GEORGETOWN PIKE (GTP) INTERCHANGE

Dates

Time

Direction

Description

Limits

Reason

5/2/25 & 5/4/25

(F & Sun)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

Northbound I-495 exit ramp to GTP (Exit 44)

Paving work

5/2/25 & 5/4/25

(F & Sun)

10 p.m. – 5 a.m.

Eastbound & Westbound

Ramp closure with detour

GTP on-ramp from to northbound I-495

Paving work

5/5/25 – 5/9/25

(M-F)

9:30 a.m. – 3 p.m.

Westbound

Single right lane closure

Balls Hill Road to Linganore Drive

Cabling work

5/5/25 – 5/8/25

(M-Th)

9:30 a.m. – 3 p.m.

Eastbound & Westbound to Southbound

Ramp narrowing

Georgetown Pike to southbound I-495

Drainage work

5/9/25

(F)

9:30 a.m. – 2 p.m.

Eastbound & Westbound to Southbound

Ramp narrowing

Georgetown Pike to southbound I-495

Drainage work

5/5/25 – 5/8/25

(M-Th)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour


More information

Northbound I-495 exit ramp to GTP (Exit 44)

Paving work

5/5/25 – 5/8/25

(M-Th)

10 p.m. – 5 a.m.

Eastbound & Westbound

Ramp closure with detour


More information

GTP on-ramp from to northbound I-495

Paving work

OLD DOMINION DRIVE

Dates

Time

Direction

Description

Limits

Reason

5/5/25 – 5/8/25

(M-Th)

9:30 a.m. – 3 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Dulany Drive to Dominion Court

Cabling work

5/9/25

(F)

9:30 a.m. – 2 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Dulany Drive to Dominion Court

Cabling work

LEWINSVILLE ROAD

Dates

Time

Direction

Description

Limits

Reason

5/5/25 – 5/8/25

(M-Th)

9:30 a.m. – 3 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Snow Meadow Lane to Scotts Run Road

Drainage work

5/9/25

(F)

9:30 a.m. – 2 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Snow Meadow Lane to Scotts Run Road

Drainage work

DULLES TOLL ROAD (DTR) & DULLES AIRPORT ACCESS HIGHWAY (DAAH)

Dates

Time

Direction

Description

Limits

Reason

5/5/25 & 5/6/25

(M & Tu)

10 a.m. – 3:30 p.m.

Eastbound DTR

Right shoulder closure

Near the I-495 interchange

Cabling Work

5/5/25 – 5/8/25

(M-Th)

9 a.m. – 3 p.m.

Westbound DTR

Single left lane closure

Near the I-495 interchange

Cabling work

5/5/25 – 5/10/25

(M-Sat)

9:30 p.m. – 5 a.m.

Eastbound DTR/DAAH

Ramp closure with detour

Eastbound DTR/DAAH to northbound I-495, Exit 18B

Paving work

5/9/25 & 5/10/25

(F & Sat)

10 p.m. – 5 a.m.

Westbound DTR

Ramp closure with detour


More information

Westbound DTR to northbound I-495, Exit 18

Northbound traffic shift

Traffic Changes

New Ramp Alignment for Traffic Exiting George Washington Memorial Parkway to Southbound I-495 and Georgetown Pike (Exit 44) and Southbound I-495 Traffic Exiting at Georgetown Pike (Exit 44)


The new ramp alignment is located on the outer edge of the Beltway and runs parallel to southbound I-495 between George Washington Memorial Parkway (GWMP) and Georgetown Pike. Drivers exiting northwest GWMP to southbound I-495 (Capital Beltway Outer Loop) now must stay in the right lane of the ramp and merge onto I-495 just south of the Georgetown Pike Bridge and motorists heading to Georgetown Pike (Exit 44) now remain in the left lanes of the ramp to reach the exit. Southbound I-495 Exit 44 collector road traffic now enters the new ramp alignment just after Exit 43 for GWMP, and will exit left to access Georgetown Pike (Exit 44).


Drivers should pay close attention to signage and lane markings, and use caution while getting acclimated to these new traffic patterns.


Click here to read more about the ramp shift.

New Exit Ramp for I-495 North Exit to Dulles Toll Road


Reminder: Motorists traveling on northbound I-495 heading for westbound Dulles Toll Road must take a new, earlier exit. The new exit ramp is located about one-third of a mile ahead of the old, closed Exit 45. To facilitate this new traffic pattern, I-495 has been reduced from four to three lanes for approximately one-half mile near the Dulles Corridor interchange.

George Washington Memorial Parkway West at I-495


Reminder: The ramp from westbound George Washington Memorial Parkway to southbound I-495 (Capital Beltway) was reduced from two lanes to one lane to make room for a construction vehicle haul route that will be separated from traffic by a physical barrier. This traffic change will be in effect throughout construction on the 495 NEXT project.

Project Background

The I-495 Express Lanes Northern Extension (495 NEXT) project will extend the existing 495 Express Lanes north by two-and-a-half miles from the Dulles Corridor interchange to the George Washington Memorial Parkway interchange in the vicinity of the American Legion Bridge. The project will provide new and improved connections at the Dulles Corridor and George Washington Memorial Parkway.


Other project benefits include four miles of new bicycle and pedestrian connections including a shared-use path parallel to I-495 from Lewinsville Road to near Live Oak Drive, replacement or rehabilitation of seven bridges with pedestrian accommodations, replacement of nine existing noise walls and construction of a new noise wall, environmental improvements introducing stormwater management facilities and funding of restoration at Scott's Run stream, and dedicated funding to support transit improvements in the corridor including new bus service over the American Legion Bridge. 

 

495 NEXT is a public-private partnership project between the Commonwealth of Virginia and Transurban, operator of the existing 495 Express Lanes. Lane Construction is the design-build contractor for the project. The new extended lanes are scheduled to open in 2025. 

Learn More About the Project


Check out 495next.vdot.virginia.gov for additional information.


Sign up to receive project email updates.



Laptop showing 495 NEXT website

Questions?

Email: 495NorthernExtension@vdot.virginia.gov

Call: Construction Inquiry Line, 703-592-6430

Virginia Department of Transportation, Michelle Holland, 703-586-0487

Transurban, Mike McGurk, 571-421-5364

Lane Construction, John Undeland, 703-785-3461