495 NEXT Lane Closures and Traffic Changes

For July 10 - July 15, 2022

What's Happening This Weekend?


Sunday, July 10, 9:30 p.m. to 5 a.m. 

Single left lane closures are scheduled on east- and westbound Georgetown Pike Bridge over I-495 for continued bridge median demolition work.

The following construction-related lane closures and traffic changes are planned to occur in the I-495 Express Lanes Northern Extension (495 NEXT) project corridor. Travelers should expect potential delays when traveling in this area, and are encouraged to visit 511virginia.org for current information on travel conditions and work zones in Virginia. All construction-related work and closures are subject to change based on weather and other factors.

Upcoming Highlights

  • Daytime mobile and single lane closures on I-495 and George Washington Memorial Parkway Bridge over I-495.
  • Nighttime single lane closures on east- and westbound Georgetown Pike Bridge over I-495.

Lane Closures 

I-495 (CAPITAL BELTWAY)


I-495 North and South between Dulles Toll Road and American Legion Bridge


Monday, July 11, and Tuesday, July 12, 9:30 a.m. to 3 p.m.

Tentative mobile left lane closures are scheduled on north- and southbound I-495 between the Dulles Toll Road and the American Legion Bridge for roadway inspection work.


GEORGETOWN PIKE INTERCHANGE


Georgetown Pike Bridge over I-495


Sunday, July 10, and Monday, July 11, 9:30 p.m. to 5 a.m.

Single left lane closures are scheduled on east- and westbound Georgetown Pike Bridge over I-495 for continued bridge median demolition work. 


GEORGE WASHINGTON MEMORIAL PARKWAY INTERCHANGE


George Washington Memorial Parkway Bridge over I-495


Tuesday, July 12, through Friday, July 15, 9:30 a.m. to 3 p.m.

Alternating single lane closures are scheduled on east- and westbound George Washington Memorial Parkway Bridge over I-495 for bridge inspections.

Traffic Changes

I-495 (CAPITAL BELTWAY)


I-495 North between Dulles Toll Road and George Washington Memorial Parkway


Reminder: The Green Arrow/Red X left-shoulder lane is now permanently closed on northbound I-495 in Virginia from where the current I-495 Express Lanes end near the Dulles Toll Road to the George Washington Memorial Parkway. This closure is to accommodate new bridge construction that will span the wider, future Beltway at Old Dominion Drive, Georgetown Pike and Live Oak Drive. Learn more about the closure here.

Project Background

The 495 Express Lanes Northern Extension project (495 NEXT) will extend the existing 495 Express Lanes north by two-and-a-half miles from the Dulles Corridor interchange to the George Washington Memorial Parkway interchange in the vicinity of the American Legion Bridge. The project will provide new and improved connections at the Dulles Corridor and George Washington Memorial Parkway.


Other project benefits include four miles of new bicycle and pedestrian connections including a shared-use path parallel to I-495 from Lewinsville Road to near Live Oak Drive, replacement or rehabilitation of seven bridges with pedestrian accommodations, replacement of nine existing noise walls and construction of a new noise wall, environmental improvements introducing stormwater management facilities and funding restoration of the stream at Scotts Run, and dedicated funding to support transit improvements in the corridor including new bus service over the American Legion Bridge. 

 

495 NEXT is a public-private partnership project between the Commonwealth of Virginia and Transurban, operator of the existing 495 Express Lanes. Lane Construction is the design-build contractor for the project. The new extended lanes are scheduled to open in 2025. 

mainphoto1722.png

Learn More About the Project



Check out www.495NEXT.org for additional information.


Sign up here to receive project email updates.

laptop_495EX website.png

Questions?

Visit: www.495NEXT.org

Email: 495NorthernExtension@vdot.virginia.gov

Call: 495 NEXT, Construction Inquiry Line, 703-592-6430