Happening This Weekend


Closures happening this weekend:



  • Multi-lane closures will be in place on northbound and southbound I-495 from the Dulles Toll Road to George Washington Memorial Parkway on Friday, July 11, from 10 p.m. to 8 a.m. for paving and road widening work.
  • SB will be from River Road (Rte. 190) to DTR 
  • NB will be from ODD to GWMP 


  • Multi-lane closures will also be in place on northbound and southbound I-495 from the Dulles Toll Road to George Washington Memorial Parkway on Saturday, July 12, from 10 p.m. to 8 a.m. for median barrier demo and road widening work.


  • Multi-lane closures will also be in place on northbound and southbound I-495 from the Dulles Toll Road to George Washington Memorial Parkway on Sunday, July 13, from 10 p.m. to 5 a.m. for paving, median barrier demo, and road widening work.


  • The ramp from George Washington Memorial Parkway to southbound I-495 will be closed and detoured on Friday, July 11, and Saturday, July 12, from 10 p.m. to 5 a.m. for noise wall panel installation work.


  • A single lane closure with flagging operations will be in place to alternate traffic between Langley Swim and Tennis Club and Green Oak Drive on Friday, July 11, and Saturday, July 12, from 9 p.m. to 5 a.m. for noise wall panel installation work.


  • Single lane closures will be in place on eastbound and westbound Dulles Airport Access Highway on Friday, July 11, from 9 p.m. to 5 a.m. for bridge work.


  • A single right lane closure will be in place on westbound Dulles Toll Road near the I-495 interchange on Friday, July 11, from 9 p.m. to 5 a.m. for cabling work.



  • The right shoulder will be closed on northbound I-495 from GWMP to the American Legion Bridge. 

Upcoming Highlights

  • I-495 North and South – Daytime single lane closures, shoulder closures, and nighttime multi-lane closures and ramp closures with detours
  • George Washington Memorial Parkway – Daytime shoulder closures and nighttime ramp detours
  • Live Oak Drive – Daytime flagging operations, including extended daytime hours, 7 a.m. to 7 p.m.
  • Balls Hill Road –Daytime flagging operations
  • Georgetown Pike Nighttime ramp detour
  • Dulles Toll Road and Dulles Airport Access Highway – Daytime single lane closures and nighttime single and multi-lane closures and ramp closures with detours

Lane Closures by Location

I-495 (CAPITAL BELTWAY) IN VIRGINIA

Dates

Time

Direction

Description

Limits

Reason

7/11/25 - 7/12/25

(F-Sat)

10 p.m. – 8 a.m

Northbound & Southbound

Multi-lane closures

Dulles Toll Road to George Washington Memorial Parkway

Paving, median barrier demo, road widening work

7/13/25

(Sun)

10 p.m. – 5 a.m

Northbound & Southbound

Multi-lane closures

Dulles Toll Road to George Washington Memorial Parkway

Paving, median barrier demo, and road widening work

7/14/25 – 7/17/25

(M-Th)

10 a.m. – 3 p.m.

Northbound

Single lane closure

Dulles Toll Road to George Washington Memorial Parkway

Road widening work

7/12/25 (Sat)

&

7/18/25 - 7/19/25

(F & Sat)

10 a.m. – 3 p.m.

Northbound

Shoulder closure

George Washington Memorial Parkway to American Legion Bridge

Cabling work

7/14/25 – 7/17/25

(M-Th)

9:30 a.m. – 2:30 p.m.

Southbound

Single lane closure

George Washington Memorial Parkway to Dulles Toll Road

Road widening and cabling work

7/18/25 & 7/19/25

(F & Sat)

9:30 a.m. – 2:30 p.m.

Southbound

Shoulder closure

Old Dominion Drive to Dulles Toll Road

Cabling work

7/14/25 – 7/17/25

(M-Th)

9:30 p.m. – 5 a.m.

Northbound & Southbound

Multi-lane closures

Dulles Toll Road to George Washington Memorial Parkway

Paving and road widening work

7/18/25

(F)

8 p.m. – 10 a.m.

Northbound

Multi-lane closures

Dulles Toll Road to George Washington Memorial Parkway

Paving work

7/18/25 & 7/19/25

(F & Sat)

8 p.m. – 10 a.m.

Southbound

Multi-lane closures

George Washington Memorial Parkway to Dulles Toll Road

Paving work

7/14/25 – 7/17/25

(M-Th)

10 p.m. – 5 a.m

Southbound

Detour

I-495 southbound to Dulles Toll Road Eastbound

(Exit 45B)

Bridge work

495 EXPRESS LANES

Dates

Time

Direction

Description

Limits

Reason

7/14/25 – 7/17/25

(M-Th)

10 a.m. – 3 p.m.

Northbound

Single left lane closure

Dulles Toll Road to Old Dominion Drive

Cabling work

7/18/25

(F)

10 a.m. – 12 p.m.

Northbound

Single left lane closure

Dulles Toll Road to Old Dominion Drive

Cabling work

I-495 (CAPITAL BELTWAY) IN MARYLAND

Dates

Time

Direction

Description

Limits

Reason

7/14/25 – 7/18/25

(M-F)

9 a.m. – 3 p.m.

Northbound & Southbound

Single left or right lane and right shoulder closure

Cabin John Park to American Legion bridge

Cabling work

GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) INTERCHANGE

Dates

Time

Direction

Description

Limits

Reason

7/11/25 & 7/12/25

(F & Sat)

10 p.m. – 5 a.m.

Northbound to Southbound

Ramp closure with detour

Ramp from GWMP to southbound I-495

Noise wall panel installation work

7/14/25 – 7/17/25

(M-Th)

10 a.m. – 3 p.m.

Northbound

Right shoulder closure

GWMP on-ramp to northbound I-495

Cabling work

7/18/25

(F)

10 a.m. – 12 p.m.

Northbound

Right shoulder closure

GWMP on-ramp to northbound I-495

Cabling work

7/14/25 – 7/19/25

(M-Sat)

10 p.m. – 5 a.m.

North/ Westbound

Ramp closure with detour

Ramp from north/ westbound GWMP to I-495 South

Sound wall work and traffic shift

7/14/25 – 7/17/25

(M-Th)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

Ramp from northbound I-495 to south/ eastbound GWMP

Hauling work

7/18/25 & 7/19/25

(F & Sat)

10 p.m. – 5 a.m.

Northbound

Ramp closure with detour

Ramp from GWMP to GTP

Traffic shift

LIVE OAK DRIVE

Dates

Time

Direction

Description

Limits

Reason

7/11/25 – 7/12/25

(F-Sat)

9 p.m. – 5 a.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Langley Swim and Tennis Club to Green Oak Drive

Noise wall panel installation work

7/14/25 – 7/18/25

(M-F)

7 a.m. – 7 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Langley Swim and Tennis Club to Green Oak Drive

Soundwall and roadway work

BALLS HILL ROAD

Dates

Time

Direction

Description

Limits

Reason

7/14/25 – 7/17/25

(M-Th)

9 a.m. – 3:30 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Benjamin Street to Live Oak Drive

Sidewalk and slope protection work

7/18/25

(F)

9 a.m. – 2:00 p.m.

Alternating

Single lane closure with flagging operation to alternate traffic

Benjamin Street to Live Oak Drive

Sidewalk and slope protection work

GEORGETOWN PIKE (GTP) INTERCHANGE

Dates

Time

Direction

Description

Limits

Reason

7/18/25 & 7/19/25

(F & Sa)

10 p.m. – 5 a.m.

Eastbound & Westbound

Ramp closure with detour

Ramp from Georgetown Pike to southbound I-495

Traffic shift

DULLES TOLL ROAD (DTR) & DULLES AIRPORT ACCESS HIGHWAY (DAAH)

Dates

Time

Direction

Description

Limits

Reason

7/11/25

(F)

9 p.m. – 5 a.m.

Eastbound & Westbound DAAH

Single lane closure

DAAH to northbound I-495 Express Lanes

Bridge work

7/11/25

(F)

9 p.m. – 5 a.m.

Westbound DTR

Single right lane closure

Near the I-495 interchange

Cabling work

7/14/25 – 7/19/25

(M-Sat)

9:30 a.m. – 3 p.m.; Friday hours only are 9:30 a.m. – 12 p.m.

Westbound DTR

Single left lane closure

Near the I-495 interchange

Overhead sign and cabling work

7/14/25 – 7/19/25

(M-Sa)

10 a.m. – 3:30 p.m.

Eastbound DTR

Single right/left lane closure

Near the I-495 interchange

Cabling work

7/14/25 – 7/18/25

(M-F)

10 a.m. – 3:30 p.m.

Eastbound DTR

Single left lane closure

Exit 18A, eastbound DTR to southbound I-495

Barrier work

7/14/25 – 7/18/25

(M-F)

9 a.m. – 3:30 p.m.

Eastbound DAAH

Single right lane closure

Eastbound DAAH to northbound I-495 Express Lanes

Concrete/bridge pier protection operations

7/14/25 – 7/18/25

(M-F)

8 a.m. – 2 p.m.

Westbound DAAH

Single right lane closure

Near the I-495 interchange

Cabling work

7/14/25 – 7/17/25

(M-Th)

10 p.m. – 5 a.m.

Eastbound DTR

Detour

Ramp from southbound I-495 to eastbound DTR

Bridge work

7/15/25 – 7/17/25

(T-Th)

9 p.m. – 5 a.m.

Eastbound DTR

Triple left/right lane closure

Near the I-495 interchange

Cabling work

7/14/25 – 7/18/25

(M-F)

8 p.m. – 5 a.m.

Eastbound DAAH

Single right lane closure

Near the I-495 interchange

Bridge work

7/14/25 – 7/18/25

(M-F)

8 p.m. – 5 a.m.

Westbound DAAH

Single right lane closure

Near the I-495 interchange

Bridge work

7/14/25 – 7/17/25

(M-Th)

9:30 p.m. – 5 a.m.

Westbound DTR

Single right lane closure

Near the I-495 interchange

Cabling work

Traffic Changes

Northbound and Southbound I-495 Traffic Shifting to New Beltway Alignment


Reminder: Traffic on all four general-purpose lanes of northbound I-495 (Capital Beltway Inner Loop) was shifted onto newly constructed outer lanes between just south of Old Dominion Drive and the George Washington Memorial Parkway. Traffic on all four general-purpose lanes of southbound I-495 (Capital Beltway Outer Loop) between just north of George Washington Memorial Parkway to just south of Georgetown Pike was shifted onto newly constructed outer lanes. These shifts enable crews to begin construction of the new express lanes in the center of the Beltway.


Following the first southbound I-495 traffic shift, drivers must now use two separate exits from southbound I-495 to access Exit 43 for GWMP and Exit 44 for Georgetown Pike. Instead of using the collector-distributor road that began just south of the American Legion Bridge, motorists now have two unique exit points directly from southbound I-495 for GWMP and Georgetown Pike.


Lanes on southbound I-495 between just south of Georgetown Pike to north of the Dulles Corridor Interchange near Old Dominion Drive are planned to shift in mid-July.


Click here for more information about these traffic shifts.


New Ramp Alignment for Traffic Exiting George Washington Memorial Parkway to Southbound I-495 and Georgetown Pike (Exit 44) and Southbound I-495 Traffic Exiting at Georgetown Pike (Exit 44)


Reminder: Traffic was shifted to a new ramp alignment located on the outer edge of the Beltway that runs parallel to southbound I-495 (Capital Beltway Outer Loop) between George Washington Memorial Parkway (GWMP) and Georgetown Pike. Drivers exiting northwest GWMP to southbound I-495 now stay in the right lane of the ramp and merge onto I-495 just south of the Georgetown Pike Bridge and motorists heading to Georgetown Pike (Exit 44) now remain in the left lanes of the ramp to reach the exit. Southbound I-495 Exit 44 collector road traffic now enters the new ramp alignment just after Exit 43 for GWMP and exit left to access Georgetown Pike (Exit 44).


Drivers should pay close attention to signage and lane markings, and use caution while getting acclimated to these new traffic patterns.


Click here to read more about the ramp shift.

New Exit Ramp for Northbound I-495 Exit to Westbound Dulles Toll Road


Reminder: Motorists traveling on northbound I-495 heading for westbound Dulles Toll Road must take a new, earlier exit. The new exit ramp is located about one-third of a mile ahead of the old, closed Exit 45. To facilitate this new traffic pattern, I-495 has been reduced from four to three lanes for approximately one-half mile near the Dulles Corridor interchange.

Westbound George Washington Memorial Parkway to Southbound I-495


Reminder: The ramp from westbound George Washington Memorial Parkway to southbound I-495 (Capital Beltway) was reduced from two lanes to one lane to make room for a construction vehicle haul route that will be separated from traffic by a physical barrier. This traffic change will be in effect throughout construction on the 495 NEXT project.

Project Background

The I-495 Express Lanes Northern Extension (495 NEXT) project will extend the existing 495 Express Lanes north by two-and-a-half miles from the Dulles Corridor interchange to the George Washington Memorial Parkway interchange in the vicinity of the American Legion Bridge. The project will provide new and improved connections at the Dulles Corridor and George Washington Memorial Parkway.


Other project benefits include four miles of new bicycle and pedestrian connections including a shared-use path parallel to I-495 from Lewinsville Road to near Live Oak Drive, replacement or rehabilitation of seven bridges with pedestrian accommodations, replacement of nine existing noise walls and construction of a new noise wall, environmental improvements introducing stormwater management facilities and funding of restoration at Scott's Run stream, and dedicated funding to support transit improvements in the corridor including new bus service over the American Legion Bridge. 

 

495 NEXT is a public-private partnership project between the Commonwealth of Virginia and Transurban, operator of the existing 495 Express Lanes. Lane Construction is the design-build contractor for the project. The new extended lanes are scheduled to open in 2025. 

Learn More About the Project


Check out 495next.vdot.virginia.gov for additional information.


Sign up to receive project email updates.



Laptop showing 495 NEXT website

Questions?

Email: 495NorthernExtension@vdot.virginia.gov

Call: Construction Inquiry Line, 703-592-6430

Virginia Department of Transportation, Michelle Holland, 703-586-0487

Transurban, Mike McGurk, 571-421-5364

Lane Construction, John Undeland, 703-785-3461

Facebook  Instagram  X  YouTube