I-495 (CAPITAL BELTWAY)
I-495 North and South near Georgetown Pike
Monday, September 26, 9:30 a.m. to 3 p.m.
Single left lane closure on northbound I-495 between the Old Dominion overpass and the Georgetown Pike Bridge for pouring concrete footing. Note: This closure may be delayed to Tuesday, September 27, during the same hours.
Monday, September 26, 9:30 a.m. to 3 p.m.
Single left lane closure on southbound I-495 at the Georgetown Pike Bridge for pouring concrete footing.
I-495 North and South at George Washington Memorial Parkway Interchange
Monday, September 26, through Thursday, September 29, 10 p.m. to 5 a.m.
Triple left lane closures on southbound I-495 at the George Washington Memorial Parkway interchange for bridge repair work.
Tuesday, September 27, through Thursday, September 29, 9:30 a.m. to 3 p.m.
Single right lane closure on northbound I-495 between Georgetown Pike and the George Washington Memorial Parkway exit for clearing and shoulder widening activities on the George Washington Memorial Parkway exit ramp.
Friday, September 30, 10 p.m. to 5 a.m.
Single right lane closure on southbound I-495 at the George Washington Memorial Parkway interchange for bridge repair work.
GEORGE WASHINGTON MEMORIAL PARKWAY INTERCHANGE
George Washington Memorial Parkway Bridges over I-495
Monday, September 26, through Friday, September 30, 10 p.m. to 5 a.m.
Single lane closures in each direction of the George Washington Memorial Parkway bridges over I-495 for patch work repairs on the bridges.
|