We hope everyone is doing well. We have had perfect painting weather this week and Valcourt is moving along with the painting project. On Wednesday evening, the '13, '14, and '15 stacks of Tower 1 balconies have been opened from 23 floor down to the 14 floor. On Thursday, 1/10/19 they will continue and open floors 13 down to the ground. As weather permits by Friday 1/11/19 you will start to see their stage move over to the next section of '11 and '12 stacks of Tower 1. Remember, as crews begin work on the south balcony, they will first work from top floor to the bottom of the stacks on all ceilings. They will then paint all walls, top to bottom of the stacks. Lastly, they finish with the balcony deck waterproof coating, which will take a few days to cure as it is not simply a paint coating but a waterproof product designed to protect the concrete. Once the waterproof coating is set to begin on the balcony deck, all furniture will need to be pulled inside the unit and the balcony will be locked off. If you need assistance moving furniture off the balcony, please contact Owner Services at (850)563-1017.

On Tower 2, crews are finishing the northeast ('09 units, road side balcony) and northwest ('01 units, road side balcony), before moving to the sides of the building. Within the next 7-10 days crews should begin work on the south (beach side balconies) of Tower 2. We will continue to send updates and notices via Constant Contact email. As always, should you have any questions, please do not hesitate to let us know.

We apologize for any inconvenience.

Thank you,

Paul Shamblin,
Association Manager
11212 Front Beach Road
Panama City Beach, FL 32407