Monday Morning Coffee and Technical Notes

October 26, 2026 View as Webpage

 
 

Upcoming Events


October 26  – Review and sign the Station Log


October 30 – ETRS Form one due


November 5 – Required Monthly Test (RMT) 11:15 AM


November 17 – National Periodic Test of the EAS system

ETRS Form One Filings


All EAS Participants are required to participate in the nationwide EAS test and make required filings in the Commission’s EAS Test Reporting System (ETRS). 

 

All EAS Participants must submit their annual ETRS Form One for calendar year 2026 no later than October 30, 2026. 


 

 

Time Change November 1st, 2026

Daylight saving time ends on Sunday, November 1st.


Most of the United States will return to standard time at 2:00 AM local time on that date.


The time change is especially important for broadcast operations, where precise timing is essential. AM stations that adjust their operating mode by time of day should ensure their control systems account for the change.



Moving from Daylight Savings time to standard time involves moving clocks back one hour.



DasDec Video outlining correct setup for the NPT Test


Digital Alerting Systems has updated their website with more information about the upcoming NPT, including a brief video showing people how to set their inputs correctly.


 You can find this information here: https://www.digitalalertsystems.com/2026nationwideeastest





National EAS Test Scheduled


As we have been reporting for several weeks, the National EAS Test will be transmitted on November 17, 2026. 


FEMA will transmit the nationwide test of the EAS at 2:20 p.m. Eastern Time (ET) using the Integrated Public Alert and Warning System (IPAWS). If conditions on that date require the rescheduling of the test, it will be conducted on December 3, 2026.

Engineers should ensure the station EAS equipment receives and decodes correctly, the Required Weekly Test (RWT) from IPAWS each Monday at 11:00 AM local time.


The national test will be fed via IPAWS. 


______________________________________________________


Program Clock Reference


Probably the most important item in the television transport stream is the Program Clock Reference (PCR). The entire ATSC system relies on correct timing of the creation and reception of all the elements in the transport stream. In a somewhat similar fashion, we had the same thing in NTSC with Vertical and Horizontal sync.


The encoder has an internal clock operating at 27 MHz which the various elements are locked to. A sample of this clock, called the PCR is inserted in the stream every 100ms and is used to lock the clock located in the customers receiver.


If the PCR time stamp does not occur when the receiver expects it “PCR jitter” can occur. This often happens anytime you multiplex streams....and the more services you are multiplexing into a stream the harder it is to keep the spacing for PCR accurate. Not only can this happen in the station encoder but also during re-endcoding at a cable head in.


While encoding and re-encoding PCR jitter can be created because of packet respacing. This can lead to underflow or overflow in the receiver buffers. The more services in the stream sometimes can make it more difficult for the PCR to remain in the correct location.


 _______________________________________________________


ABA 80th Anniversary Tour


Across the state this year, the ABA has been celebrating the wonderful partnerships between broadcasters and community stakeholders, PLUS inducted legendary broadcasters into our Hall of Fame.


So far ABA has hosted receptions at 8 different cities around the state. The final stop on the tour will in Birmingham on November 18th.



The Birmingham reception will be held at Ross Bridge Resort in Birmingham.

Register here for the Birmingham reception.


___________________________________________________________________


FCC Inspections


Yes Virgina, the FCC can and will inspect broadcast operations to ensure complete compliance with Commission Rules and Regulation.  

One recent inspection dealt with a group of stations not monitoring the correct sources with their EAS decoder.


11.52(d)(1): “EAS Participants must comply with the following requirements: With respect to monitoring for EAS messages that are formatted in accordance with the EAS Protocol, EAS Participants must monitor two EAS sources.


The monitoring assignments of each broadcast station and cable system and wireless cable system are specified in the State EAS Plan and FCC Mapbook. They are developed in accordance with FCC monitoring priorities.”


If for technical reasons you are unable to monitor the correct sources, stations are required notify the State Emergency Communications Committee (SECC) for alternate monitoring sources.

In addition, the stations were not maintaining a “Station Log” correctly.


73.1820(a): “Entries must be made in the station log either manually by a person designated by the licensee who is in actual charge of the transmitting apparatus, or by automatic devices meeting the requirements of paragraph (b) of this section .


(b) All Stations: An entry of each test and activation of the Emergency Alert System (EAS) pursuant to the requirement of [47 CFR § 11, et seq.] and the EAS Operating Handbook.


(c): “The chief operator is responsible for completion of the following duties specified in this paragraph below. When these duties are delegated to other persons, the chief operator shall maintain supervisory oversight sufficient to know that each requirement has been fulfilled in a timely and correct manner.


Review of the station records at least once each week to determine if required entries are being made correctly. Additionally, verification must be made that the station has been operated as required by the rules or the station authorization. Upon completion of the review, the chief operator or his designee must date and sign the log, initiate any corrective action which may be necessary, and advise the station licensee of any condition which is repetitive.”


If you have any question about EAS compliance contact your state’s SECC or State Broadcasters Association. In Alabama email the SECC.



____________________________________________________________________



This is terrible and I have misplaced the fence guys number!

Pro Audio – FOH Engineers


Newcomers to live sound often see working as a FOH engineer as an exciting opportunity. It can be, but the role carries real responsibility: you can make or break the event, and everyone relies on you to get it right.


Before taking a seat at the mixer, learn as much as possible from experienced FOH engineers. Listen to their mixes, ask to observe their work, and take plenty of notes. Save questions for downtime—never interrupt a performance.

 

Although the house system is separate from FOH mixing, learn from system technicians what they do and why. Build your people skills by listening to performers, A2s, monitor mixers, backline crew, and others.


When starting out, do not question a performer’s or manager’s decisions. Completing Mixing 101 does not mean you are mixing for yourself. First, earn the crew’s trust by delivering the sound the performer wants the audience to hear. Only then should you suggest ways to improve the performance.



Above all, practice consistently—it is the only way to build confidence in your ability to stay clearheaded under pressure.


Quote of the Week


Leadership begins when you stop asking who is responsible and start asking what I can do.


  • Zig Ziglar

Inspirational Quote of the Week


“Give It All to Jesus”

summarizes the idea of total surrender to Christ,





The information offered in this newsletter is that of the editor and not of any other entity or individual.

We welcome any comments or suggestions about this newsletter, send to lwilkins@al-ba.com