|
September Required Monthly Test (RMT)
The September Required Monthly Test (RMT) will be fed on Thursday September 10th at 11:15 am central time. The test will be distributed on both the GSSNet Satellite system and IPAWS.
Stations are reminded that once you receive the RMT it must be relayed on all your over-the-air (OTA) streams within a 60-minute window.
Enter the results of the reception and retransmission in the Station Log.
______________________________________________________
Don’t Forget the Paperwork!
Broadcast engineering is not just technical, there are some “paperwork” that must be completed regularly. Not only is it because they are required by FCC rules but also helps to make sure that the station is operating correctly.
Some of the documents include:
· Station Log. These logs document the proper operation of the EAS system, proper operation of the tower light system, and proper operation of the RF system. The station log must be reviewed weekly for accuracy of the data, then signed and dated by the Chief Operator. If any issues are discovered it should be reported to the correct station personnel.
· Quarterly Tower Light Inspection. While closely related to the Station Log, this report documents the proper operation of the entire tower light system (not just the lights) including control, reporting, monitoring, and alarms.
· Transmitter Maintenance Log. Although not specifically part of the FCC rules, keeping a detailed maintenance log aids in complying with part 73.1350 “Each licensee is responsible for maintaining and operating its broadcast station in a manner which complies with the technical rules set forth elsewhere in this part and in accordance with the terms of the station authorization”.
· Station Authorizations. Engineers should ensure that all required authorizations are available and they are accurate and up to date.
Maintaining these documents correctly and timely should be high on your “do to list”.
|