Southern Industrial Contractors
performed upgrades to the Pickling Line and the Tandem Cold Mill (PLTCM) during the construction phase of the new Galvanizing Line. This work involved removing existing equipment, demolition of existing floor slabs/foundations, relocation of existing underground utilities, excavation of deep foundations in a shale material, installation
of new heavy concrete equipment foundations, installation of equipment anchor pockets, installation of numerous anchor bolts / embeds, and epoxy grouting of the new equipment. Southern Industrial Contractors crushed all demolished concrete with our ASTEC track-mounted crusher and reinstalled the old floor slabs as a new subbase for the new equipment foundations.