I-64 Southside Widening and High Rise Bridge Expansion Project

Updated Project Information Related to Maritime Traffic - April 2020
Maritime Work Plan for High‐Rise Bridge Construction, including detailed plan sheets illustrating maritime construction location and project scope: VIEW HERE

VDOT's I-64 Southside Widening and High Rise Bridge, Phase 1 Project will widen nearly 9 miles of I-64 to three full-time travel lanes in each direction, including one Express lane between Bowers Hill and Battlefield Boulevard, and construct a new 100-foot vertical clearance fixed-span bridge over the Elizabeth River serving motorist traveling to Virginia Beach.

Other improvements include replacing the Great Bridge Boulevard overpass, installing sound walls, resurfacing the existing roadway and stormwater management facilities.

In the Elizabeth River, work will include changes in channel layout, and removal and replacement of the existing fender system. Additional substructure changes include pile driving, pile cap construction, column construction, and cap construction. Superstructure work includes beam erection.
Project Details

LOCATION
From .06 mile east of the I-264 interchange at the Bowels Hill to 0.9 mile east of the I-464 interchange

DESIGN BUILD CONTRACTOR
Granite - Parsons - Corman

PROJECT SCHEDULE
Construction Began: Summer 2018
Completion: July 2021


ON-SITE PROJECT SUPERINTENDENTS AND CONTACTS
Steve White
General Superintendent
804.832.9271

Jason Cochran
Superintendent
202.264.0645

Roger Schindele
Construction Manager
813.245.8563

VESSELS WORKING IN THE AREA
Barge: 067-217
4100 Manitowoc Ringer S3: 035-085

Barge: KS6006
LR 1300

Barge SQ1698
Mantis Tadano

Material Barge M373

Additional vessels to be added as they become available.

NOAA CHART #: US5VA17M

MARITIME PLAN SHEETS: Download Here
Click project map below to enlarge.
Click construction schedule below to enlarge.