The 69Express Project requires a range of construction activities, including some that may fly under the radar. To prepare the roadway for express lanes, crews are installing underground tolling technology that will work jointly with overhead equipment to accurately capture the KTAG and license plate photos for drivers choosing to utilize the express lanes.
Recently, KDOT and the Kansas Turnpike Authority (KTA) inspected several of these underground conduits to confirm accurate placement prior to new concrete pavement being poured on top of the conduits. As the project continues, all technology will be inspected and tested to ensure seamless, successful operation of the new express lanes.
|