Photo shown above: Martha Avenue waterline replacement in the Village of Lakemore, Ohio

Hammontree, the Village Engineer for Lakemore, recently designed the Martha Avenue Waterline. This new 6" waterline is approximately 890 feet long with 2 hydrant assemblies, gate valves at each end (Sanitarium Road and Church Street), and 16 water re-connections. The project also includes replacing the asphalt surface course on the entire street. The Village of Lakemore obtained a grant from Summit Count to pay for a portion of this project.
Services provided include:
  • Topographic Survey and Base Mapping
  • Waterline Design
  • Bidding and Construction Management Services
  • Construction Observation