VDOT logo
495 Express Lanes Northern Extension (495 NEXT) logo

TRAFFIC ALERT

495NEXT.vdot.virginia.gov

March 14, 2025

RELEASE:

  CONTACT:

IMMEDIATE

Michelle T. Holland, 703-586-0487

Michelle.Holland@vdot.virginia.gov

NIGHTLY RAMP CLOSURE FROM GEORGETOWN PIKE TO SOUTHBOUND I-495 IN VIRGINIA SCHEDULED

MONDAY, MARCH 17 THROUGH MARCH 21

Motorists should follow posted detour

FAIRFAX, VA – Starting Monday night, March 17, and continuing nightly through Friday, March 21, the ramp from Georgetown Pike to southbound I-495 will be closed. The ramp closure will occur nightly between 10 p.m. and 5 a.m. the next morning, to allow crews to conduct noise wall work as part of the I-495 Express Lanes Northern Extension (495 NEXT) project. 


During the ramp closure, motorists traveling on east- and westbound Georgetown Pike to southbound I-495 will be detoured as follows:


  • Exit Georgetown Pike to southbound Balls Hill Road
  • Take southbound Balls Hill Road to turn left onto Lewinsville Road
  • Exit right from Lewinsville Road onto southbound Rt. 123/Dolley Madison Boulevard 
  • Take southbound Rt. 123/Dolley Madison Boulevard to the on-ramp for southbound I-495

In the event of inclement weather or other delays, this work may be prolonged or rescheduled. Drivers are urged to use caution and expect potential delays if traveling through this area.


Check VA 511 for traffic, work zone and incident information online at 511.vdot.virginia.gov, on the mobile app, or by calling 511 from any phone in Virginia.


Visit 495next.vdot.virginia.gov for the latest construction and lane closure information.


# # #