|
2025/2026 Planning Studies
• 5.10 New Kings Road (US 1) Corridor Safety Evaluation
• 5.11 Protected Bicycle Lanes Study
• 5.12 Roadway Capacity Study for CR 209 (Russell Road)
• 5.13 Countywide Street Lighting Study
• 5.14 Citrona Corridor Redesign
• 5.15 Atlantic Avenue at Fletcher Avenue (A1A) Intersection Study
• 5.16 Trail Inventory and Gap Study
• 5.17 First Street Bike/Ped Study
• 5.18 SMART St. Augustine Performance Measure Evaluation
• 5.19 E-Bike Pilot Study
• 5.20 JAXPORT Terminal Optimization Study
• 5.21 Shearwater and Silverleaf Traffic Noise Study
• 5.22 St. Augustine Beach Traffic Calming Program Update
• 5.23 Port of Fernandina Traffic Study
• 5.24 Best Foot Forward Pedestrian Safety Program
|