What's Happening

The City of Miami Beach’s contractor, Vortex Companies, is currently rehabilitating the gravity sanitary sewer pipes and manholes that serve the North Beach area. The work is taking place at the intersection of 69 Street and Abbott Avenue.


A sewer-grade lining will be installed on the inside of the existing sewer pipes to create an internal pipe that extends the useful life of the sewers to ensure proper functionality of the sewer system in the area. This work is intended to take place through the access sewer manholes.


The city will use CCTV technology to perform a sewer inspection of the lines that will allow them to pinpoint the type of work needed. In addition, the City will be performing manhole rehabilitation.


This initiative is one part of the overall action plan aimed at improving water quality throughout Mid Beach. To learn more please visit: www.mbrisingabove.com/waterquality.


Please note that the City of Miami Beach has easement agreements that allow access to utilities located on private properties. If there is a city manhole behind your property, you are required to provide access for inspection, maintenance, and necessary repairs to ensure proper functionality.


Timeline

Repair work will take place on Tuesday, May 27, 2025 from 7 a.m. to 7 p.m. Additional time is subject to approval and community notification. 


Please know that this schedule may change due to weather and unforeseen circumstances. 


What to Expect

  • Please minimize water usage between the hours of 7 a.m. to 7 p.m. Avoid using high-volume water sources such as washing machines, showers, baths or dishwashers as much as possible during this time. 
  • You will receive a door hanger 48 hours prior to work commencing in your area. 
  • Limited bathroom usage is permitted. 
  • If all plumbing traps and internal vents are operational, properties near the work zone should not be affected by any odors from this project.
  • Crews, trucks and equipment will be on-site during this time accessing the manholes in the street, parking spaces, and on occasion in yards.
  • Parking spaces adjacent to manholes will need to be accessed.
  • Please adhere to the "NO PARKING" signs and refrain from parking in these spaces. Vehicles parked in "NO PARKING" spaces will be towed at the owner's expense.
  • Sewer service will be interrupted while work is being completed in your area. Potable water service will be available. 
  • If the property has a sump pump connected to the sewer system, please unplug it during the installation process.
  • This project is ongoing. Work will be performed in multiple locations throughout Mid Beach.


Contact

For more information, please contact Gabriella Gonzalez, Neighborhood Affairs Coordinator, at GabriellaGonzalez@miamibeachfl.gov.

To learn more about the city’s projects and initiatives, visit www.miamibeachfl.gov/NAD.


To request this material in alternate format, sign language interpreter (5-day notice required), information on access for persons with disabilities, and/or any accommodation to review any document or participate in any city-sponsored proceedings, call 305.604.2ADA (2232) (voice), select 1 (English) or 2 (Spanish) and leave a message with your request. TTY users may call via 711 (Florida Relay Service). You can also make requests online at www.miamibeachfl.gov/ada by selecting ADA request.