In October, crews continued construction activities along the corridor:
Area 1: Reston Avenue to Colvin Forest Drive (Except Baron Cameron Avenue Intersection)
- Opened the third through-lane on westbound Route 7 to traffic.
- Completed noise barrier panel installation along eastbound Route 7 between Baron Cameron Avenue and Delta Glen Court.
- Continued grading for the shared-use path along eastbound Route 7 between Reston Avenue and Reston Parkway.
Area 2: Baron Cameron Intersection
-
Continued storm sewer installation , earth-moving activities, grading, and cement stabilization for Stage 3A.
Area 3: Difficult Run Area (Colvin Forest Drive to Faulkner Drive)
- Completed demolition of the remaining existing Difficult Run bridge.
- Continued construction of the foundations for the new Difficult Run bridge on westbound Route 7.
- Continued storm sewer installation between the new pedestrian underpass at Colvin Run Mill Park and Difficult Run.
Area 4: Faulkner Drive to Jarrett Valley Drive
- Continued noise barrier panel installation along westbound Route 7 on the east side of Forestville Drive.
-
Continued storm sewer installation for Stage 3A between Newcombs Farm Road and Beulah Road.
- Continued grading, placement of cement-treated aggregate, and base asphalt placement along eastbound Route 7 between Middleton Ridge Road and Beulah Road.
- Started underdrain and curb installation between Middleton Ridge Road and Atwood Drive.
- Completed earth-moving activities and cement stabilization for Stage 3A between Beulah Road and Atwood Drive.
-
Began storm sewer installation for Stage 3A between Lucky Estates Drive and Wolftrap Run Road.
- Started underdrain and curb installation and continued asphalt placement between Trap Road and the west side of McLean Bible Church.
-
Completed storm sewer installation for Stage 3A between Wolftrap Run Road and the west side of McLean Bible Church.
Third-party utility design and relocation activities are also ongoing.