|
NEWPORT NEWS – Starting as early as May 3, contractor crews with the Virginia Department of Transportation (VDOT) are scheduled to implement overnight, full road closures for the bridge replacement project on Denbigh Boulevard over Interstate 64 in Newport News, with signed detours in place.
To perform milling and paving operations, crews will close Denbigh Boulevard in both directions between Pocahontas Drive and Millwood Drive from as early as 7 p.m. until as late as 6 a.m., May 3-4 and May 7-8. A signed detour will be in place directing motorists traveling along Warwick Boulevard and Jefferson Avenue to use Bland Boulevard as an alternate route during each road closure.
This construction work is weather- and schedule-dependent; therefore, this schedule is subject to change.
For more information on the Denbigh Boulevard Bridge Replacement Project, visit the VDOT website at www.virginiadot.org/projects/hamptonroads/denbighblvdbridge.asp.
Motorists are advised to plan their commute by using VDOT’s free traffic information tools:
● Download the 511 smartphone app or 511-integrated Waze app.
● Visit the 511 Virginia website or dial 511 for traffic information on your phone.
● Follow @511HamptonRoads and @VaDOTHR on Twitter.
|