View as Webpage

Ocean Terrace Streetscape & Park Project

Project Advisory: October 17, 2023

Project Overview and Benefits

The City of Miami Beach in collaboration with Ocean Terrace Holdings, LLC (“OTH”) is excited to announce the start of construction of Ocean Terrace Park, which is the culmination of many years of community collaboration intended to beautify and pedestrianize the Ocean Terrace corridor east of Collins Avenue between 73 and 75 streets.


The Raymond Jungles designed project will be a key destination in North Beach and will link existing greenspaces to the north and south along a section of the renovated Beachwalk. Ocean Terrace Park will be a pedestrian-only sanctuary where the public can immerse themselves in the natural world within an urban setting. The park will include open public spaces and water features with retail and dining areas that will integrate seamlessly into lush plantings inspired by native dune vegetation. 


Para información en español haga clic aquí


What's Happening

Ocean Terrace will no longer be open to vehicular traffic, only emergency service vehicles will have access through the area. All parking spaces will be closed starting on Oct. 23, 2023.


A groundbreaking ceremony is scheduled for October 26, 2023, at 11:15 a.m.


Timeline

The contractor is scheduled to mobilize in mid-October 2023 and construction is estimated to be completed within 16 months.


What to Expect

  • Ocean Terrace will be permanently closed to vehicular traffic, including removing impacted parking spaces. Parking will still be available at P92 located at 299 72 Street. 
  • 73, 74 and 75 Street will remain open for local traffic and will become “no-through” streets.
  • The construction will be phased to allow continuous access to the adjacent businesses and for pedestrian traffic between 73 and 75 Street.
  • While under construction, there will be a detour in place for all Beachwalk traffic between 73 and 75 Street. Please heed all safety and directional signage.
  • Moderate levels of construction noise is expected during the day. Construction materials, machinery, vehicles, and personnel will be on-site daily. 


Who to Contact

Dexter Peralta, Neighborhood Affairs Coordinator at

DexterPeralta@miamibeachfl.gov

To learn more about the city’s projects and innovative initiatives, visit www.miamibeachfl.gov/NAD.


To request this material in alternate format, sign language interpreter (five-day notice required), information on access for persons with disabilities, and/or any accommodation to review any document or participate in any city-sponsored proceedings, call 305.604.2489 and select 1 for English or 2 for Spanish, then option 6; TTY users may call via 711 (Florida Relay Service).

Facebook  Twitter  Instagram