|
Dear Jason,
As we wrap up October 2023, we're delighted to share our monthly Prismo Metals update! Inside, you'll get a firsthand look at our recent activities and catch up on the highlights from our social channels.
For a quick update, this month brought us exciting news – high-grade gold mineralization has been cut in four of the first eight holes ever drilled at Los Pavitos! Notably, the best hole intersected 10.2 g/t gold over 6.6 meters. More details below!
Your ongoing support is greatly appreciated. Count on us to keep you updated as we advance our exploration at Palos Verdes, Los Pavitos, and Hot Breccia!
Warm regards,
Dr. Craig Gibson
CEO of Prismo Metals
|
| |
|
Palos Verdes (silver, Sinaloa, Mexico)
-
Ongoing Drilling: We are in the final stages of our initial >2,500-meter drilling program that commenced in May 2023. Excitingly, we've already reported bonanza-grade intervals with the best interval being a 0.5-meter sample assaying 11,520 g/t silver equivalent (102 g/t gold and 3,100 g/t silver). Stay tuned for upcoming assay results!
-
Drilling Program Expansion: Encouraged by the positive drilling outcomes, we are expanding the drilling program in collaboration with Vizsla Silver (TSXV: VZLA). An additional ten holes, totalling around 3,600 meters, will be drilled from Vizsla's adjacent concessions to target the Palos Verdes vein at depth.
| | |
|
Los Pavitos (gold, Sonora, Mexico)
-
Initial Drill Results: High-grade gold mineralization has been cut in four of the first eight holes ever drilled at Los Pavitos. The best hole, LP-SC-23-02, intersected 6.65 meters (core length) reporting 10.2 g/t gold and 47.0 g/t silver, within a wider interval of 11.93 meters (core length) averaging 5.77 g/t gold and 28.7 g/t silver.
-
Drilling Program Update: The first drill holes targeted the Hedionda mine zone along the Santa Cruz structure and were designed to determine the overall nature, geometry and lateral and vertical continuity of mineralization around this small historic working. Drilling to date represents about 850 m out of a 2000-2500 m budget and drilling has already shifted to the parallel Santa Cruz Southeast structure roughly 300 m southeast. Assays are pending for the first holes there.
Hot Breccia (Copper, Arizona, USA)
-
Permitting in Progress: We're making steady progress with the permitting process at Hot Breccia and expect to secure the permit soon.
-
Identifying High-potential Targets: Leveraging the data from the recently completed ZTEM survey, we are currently interpreting geophysics and conducting geological mapping and sampling to identify high-potential drilling targets in preparation for our initial drilling program.
| |
The Los Pavitos Project holds significant potential for hosting an orogenic gold deposit. With recent initial drill results reinforcing this idea, Dr. Craig Gibson, our President and CEO, shares insights into the mineralization style at Los Pavitos. Take a closer look at what sets this project apart! | |
For all the latest from Prismo Metals, make sure you're following us on social media! | |
🎥 Behind the scenes at Los Pavitos Core Logging Facility: The Prismo Exploration team is busy logging the fresh drill cores from our first-ever drill program at Los Pavitos. | |
🐶 Meet Skarn, our loyal and adorable mascot dog! He loves to join us in the logging area and inspect the drill cores with his keen nose. He’s always excited to see the drill cores that we’re extracting from the 2,500-m drilling program at Los Pavitos. | |
👏 Our CEO and President, Dr. Craig Gibson, is always hands-on with our exploration projects. Here’s Dr. Craig with the Prismo exploration team on-site, checking the fresh drill cores from the 2,500-meter drilling program at Los Pavitos! | |
FOLLOW US ON SOCIAL MEDIA | |
We regularly post updates, videos, and photos on our social channels. Follow us and stay updated on the latest on all of our three projects! | | | | |