Work continues to move forward on O Avenue. Pavement work – either prep work or removals – continues between Highwood Drive and 23rd Street. Residents on side streets are accessing their homes by driving on the base rock. The contractor is also grading the shoulder areas for new sidewalk, and for new pavement on 21st Street and 23rd Street.  

When grading and pavement preparation reaches 24th Street, pavement construction between 20th Street and 24th Street will begin on both O Avenue and side streets. Weather permitting, we expect pavement construction to begin mid-May.

New water main has been installed to 27th Street and is currently being tested and disinfected, and will soon be connected to homes. Finally, we expect installation of the box culvert to resume at the end of May.

As always, if you have questions or concerns, please do not hesitate to contact a member of our project team.