Planning and Economic Development

Spotlight

October 2026

This monthly update is published by the City of Poulsbo Planning and Economic Development (PED) Department to highlight news and trends in planning and development. For details on these topics and the department, visit our website.

The Director's Chair

Celebrating Community Planning Month in Poulsbo


October is National Community Planning Month, and this year is especially meaningful as Poulsbo celebrates its first-ever City Council proclamation recognizing the important role planning plays in shaping our community at City Council on Wednesday, October 7. If you read this and touch planning as a volunteer or community member, please come and join!


Throughout the month, we'll be recognizing the people who make that work possible, including our Planning Commissioners and planning staff, through our Faces of Planning series, accessible on our Poulsbo facebook page.


I cannot talk about the people who should be recognized for shaping our city without mentioning the sad news of the passing of Bill Austin, whose contributions over more than five decades have left an enduring mark on Poulsbo. From creating the Austin-Kvelstad Waterfront Pavilion and restoring our downtown clock tower to his hand-painted business signs, public art, historic preservation, and support of the Marine Science Center, Bill helped shape so much of what makes Poulsbo special. His creativity, generosity, and love for this community remind us that planning and placemaking are ultimately about people and the lasting impact they have on a place. Poulsbo is a more distinctive and welcoming community because of Bill, and his legacy will live on in the places we enjoy every day.


Poulsbo’s planning efforts are being showcased near home and beyond this month. The Raab Park ADU will be featured in the Kitsap Parade of Homes Tour on October 3 and 4, showcasing the partnership of the City of Poulsbo, Habitat for Humanity and Kitsap Builders Association to build a demonstration pre-approved ADU on city land for a future park caretaker.  


On October 8-9, at the APA Washington 2026 Annual Conference, themed “Level Up Washington: Planning for What's Next,” in Vancouver, Nikole Coleman will present “Shaping the Future: New Subdivision Guidance and Land Division Updates.” I will be presenting separately on our regional collaboration to develop pre-approved Accessory Dwelling Unit (ADU) plans. Poulsbo will also contribute a student scholarship auction basket featuring generous donations from the Poulsbo Historical Society and Museum, and the ownesr of Valholl, Della Baia, and the Loft, as well as the SIP. We're grateful for their support of the next generation of planners!


Our Blue Ribbon Commission on Housing will also reconvene on October 13 after a month off to review a draft report that outlines their findings and recommendations for addressing Poulsbo's housing ownership opportunities and challenges.


On October 14, Rob Gelder, Josh Ranes, Chief Ron Harding and I will be guest speakers at the Poulsbo Chamber of Commerce luncheon, sharing updates and providing an opportunity for questions and answers.



I also want to take a moment to recognize our amazing Planning Department team. From guiding complex development projects and advancing long-range planning efforts to answering questions and helping residents navigate the planning process, they bring professionalism and heart to everything they do. I am incredibly proud of this team and grateful for the work they do to make Poulsbo a better place.


I'm grateful to our elected officials, community members, and regional partners who contribute their time, ideas, and support to planning in Poulsbo. Our community is stronger because of the many people who contribute to Poulsbo’s future. 


Updated Resources to Help Navigate Housing +

Business in Poulsbo

The PED Department has updated two community resources: Planning for Housing and the New Business Welcome Packet. Both are designed to make complex topics easier to understand and provide useful information in one place.


Planning for Housing


The updated Planning for Housing guide provides a snapshot of housing in Poulsbo—where we are today, how we are planning for future growth, and what the City is doing to expand housing choices and address affordability.


The guide includes updated information on population and housing trends, housing costs, state planning requirements, recent development regulation changes, and the City's 2026 Housing Affordability Workshop Series.

Learn more:


New Business Welcome Packet


Thinking about opening or growing a business in Poulsbo? The updated New Business Welcome Packet is designed to help businesses understand where to start and what City requirements may apply.


The packet covers zoning, permits, business licensing, signs, taxes, City contacts, an opening checklist, and local business resources—with an emphasis on connecting with City staff early in the process.


Links to both are provided with the images below.


We hope these updated resources make it a little easier to understand how Poulsbo is planning for housing, and how we can help businesses get started and grow in our community.

Planning Poulsbo:

Understanding How Development Decisions Are Made

Development proposals often generate questions about how projects are reviewed, who makes the decisions, when the public can participate, and why certain projects are approved.


Planning Poulsbo: Understanding How Development Decisions Are Made is a monthly educational series from the City of Poulsbo's Planning & Economic Development Department designed to answer those questions by explaining the development review process in a clear, easy-to-understand way.


Our goal is to make the development review process more transparent, understandable, and accessible for everyone. Whether you're a homeowner, business owner, developer, or simply interested in learning more about how development occurs in Poulsbo, we hope this series provides helpful insight into the laws, regulations, and public processes that guide development decisions.


A new article will be published each month as we continue exploring the development review process and the topics that shape how Poulsbo grows.

Who Reviews a Development Project and What are They Looking For?


Understanding How and When to Participate in Poulsbo's Planning Process


When a development application is submitted to the City, it doesn't simply land on one person's desk for approval. Depending on the type and complexity of the project, an application may be reviewed by several City departments, outside agencies, and technical specialists, each looking at a different piece of the proposal.


The Planning & Economic Development Department coordinates the overall land use review, but planners aren't engineers, building officials, fire officials, or utility operators. Development review is a team effort, with each reviewer responsible for determining whether the portion of the project within their area of expertise meets applicable requirements.


This is also why development review can sometimes take time. A change requested by one reviewer may affect another part of the project. A revised road layout might change grading, utilities, tree retention, stormwater facilities, or even the location of buildings. Those revised plans may then need to be reviewed again by several departments.


So, who reviews what?


Planning & Economic Development


Planning staff coordinates the land use review process and evaluates how a proposed use and site plan fit within the City's adopted land use regulations.


A major part of that review is PMC Title 18, Zoning Ordinance. Depending on the zoning district and type of project, Planning may review whether a use is permitted, building setbacks and height, density, lot coverage, parking, landscaping, signage, site design, and other development standards.


Planning's review can extend well beyond basic zoning. For example, PMC Chapter 18.180 establishes tree retention requirements, while PMC Chapter 16.20 regulates critical areas such as wetlands, streams and other fish and wildlife habitat conservation areas, geologically hazardous areas, critical aquifer recharge areas, and frequently flooded areas.


Planning staff also administers the City's development review procedures under PMC Title 19, including application classification, public notice, comment periods, staff reports, decisions, and coordination with the appropriate review authority. Title 19 establishes five different permit processes and identifies who has authority to make the final decision for different types of applications.


For subdivisions and other divisions of land, Planning also reviews the proposal under PMC Title 17, Land Division, working closely with Engineering on infrastructure and subdivision standards.


Depending on the project, Planning may also coordinate environmental review under the State Environmental Policy Act, or SEPA, and review consistency with the City's Comprehensive Plan and other applicable land use regulations.


In many cases, the planner assigned to a project serves as the primary point of contact and brings all of these different reviews together into one coordinated process.


Engineering


While Planning generally focuses on how land may be used, Engineering focuses heavily on how the development will function and be served by infrastructure.


Engineering staff reviews streets, site access, sidewalks, grading, stormwater facilities, water and sewer infrastructure, transportation impacts, frontage improvements, and other public and private infrastructure associated with development.


Several portions of the Municipal Code can come into play. PMC Title 17 contains subdivision requirements, including standards related to streets, utilities, storm drainage, sidewalks, and other improvements necessary to serve newly created lots. Preliminary subdivisions, for example, must make adequate provision for streets and circulation, water, sewer, storm drainage, utilities, parks, and safe pedestrian facilities.



Engineering review can also involve PMC Title 12, Streets, Sidewalks and Public Places; PMC Title 13, Public Services; PMC Title 14, Transportation; and applicable portions of PMC Title 15, as well as the City's adopted engineering standards and specifications.


For larger development projects, Engineering review usually does not end with land use approval. Once the general development layout is approved, the applicant may submit detailed civil engineering plans showing exactly how roads, utilities, grading, stormwater facilities, sidewalks, and other improvements will be constructed.


This later review is much more detailed. It is one reason an approved subdivision or commercial project may still have substantial work remaining before construction can begin.


Building


The Building Department's role is different from land use review. Planning may determine that a building is allowed in a particular location and meets zoning requirements, but Building determines whether the structure itself can be constructed in accordance with applicable building and life-safety codes.


The City's building and construction regulations are primarily contained in PMC Title 15, Buildings and Construction, which incorporates and administers applicable state-adopted construction codes.


Building review may address structural design, accessibility, energy requirements, fire-resistant construction, occupancy classifications, plumbing and mechanical systems, means of egress, and many other construction-related requirements.

This creates an important distinction:


Land use approval is not the same thing as a building permit.


A project may have received its land use approval, but that does not mean the City has approved the detailed construction of every building shown on the plans. Detailed architectural, structural, mechanical, plumbing, and other construction documents are generally reviewed later through the building permit process.



Building staff also conduct inspections during construction to confirm that the work being completed in the field is consistent with the approved plans and applicable construction codes

Public Works and Utilities


Public Works brings an operational perspective to development review.


While Engineering may review the design and construction of new infrastructure, Public Works staff may evaluate how proposed improvements connect to the City's existing systems and how infrastructure that may eventually become City-owned will function and be maintained over the long term.


This can include water and sewer connections, utility locations, access to infrastructure for future maintenance, existing system conditions, and operational considerations associated with new development.


Many of the City's water, sewer, and other public service requirements are contained in PMC Title 13, Public Services.


Public Works may also identify practical issues that are not always obvious on a site plan. For example, infrastructure needs to be located where City crews can access it for future maintenance and repair, and proposed connections need to work with the City's existing systems.


This review is important because development does not occur in isolation. New utilities and other improvements often connect directly to larger public systems that the City must continue to operate and maintain after construction is complete.


Poulsbo Fire Department


The Poulsbo Fire Department is not a City of Poulsbo department, but it is an important partner in the City's development review process. The Fire Department works closely with City Planning, Engineering, Building, and Public Works staff to review development proposals and help ensure that emergency access and applicable fire and life-safety requirements are addressed.


Depending on the type and size of a project, fire review may include fire apparatus access roads, emergency vehicle turning movements, fire lanes, hydrant locations, fire flow, building access, and other requirements of the adopted fire code.


Fire review can have a significant influence on site design. The width or configuration of a road, the location of a building, the length of a dead-end street, or the design of a turnaround may all be affected by emergency access requirements.


Fire requirements also frequently overlap with City review. For example, a proposed road may need to satisfy City subdivision and engineering standards while also providing adequate access for emergency vehicles. Similarly, water infrastructure must serve future residents or businesses while also providing adequate fire flow.



This close coordination is why the Poulsbo Fire Department and City Engineering, Planning, Building, and Public Works staff may all review the same set of plans, but each is looking at the proposal through a different lens and applying the requirements within their area of responsibility.


Outside and Partner Agencies


Not every requirement affecting a development proposal comes from the City. Depending on the project, other local, state, federal, or tribal agencies may also participate in the review or have separate permitting authority.


These may include the Kitsap Public Health District, Washington State Department of Ecology, Washington State Department of Transportation, tribes, and utility providers. The level of coordination depends on the project and site conditions. Some of these agencies may require separate permits or approvals, meaning City approval does not necessarily mean every approval needed for a project has been issued.


Technical Specialists and Peer Review


Some development issues require specialized expertise. Applicants may be required to submit technical studies prepared by qualified professionals, such as wetland and stream reports, traffic studies, geotechnical reports, arborist reports, or stormwater analyses.


The City may also have technical reports independently evaluated through peer review. A peer reviewer can confirm an analysis, identify missing information, or recommend additional evaluation. The purpose is to ensure the technical information used by the City is complete and reliable.


So, What Is Everyone Actually Reviewing?


Despite all the departments, agencies, and specialists involved, each reviewer is ultimately answering a version of the same question:


Does this part of the project meet the standards that apply to it?


Reviewers aren't deciding whether they personally like or dislike a project. They are evaluating applicable codes and decision criteria. Depending on their role, they may be asking:


  • Is the use allowed here?
  • Does the project meet zoning and development standards?
  • Are critical areas appropriately protected?
  • Can vehicles, pedestrians, and emergency responders safely access the site?
  • Can infrastructure adequately serve the development?
  • Have environmental impacts been appropriately addressed?
  • Does the application meet the applicable decision criteria?


If additional information or changes are needed to answer those questions, staff may request additional studies or revised plans. Larger projects may go through several rounds of this technical review before they are ready for a decision.


Putting It All Together: Development Review Is a Team Effort


Imagine a new residential subdivision.


  • Planning reviews zoning, lot layout, setbacks, open space, trees, critical areas, environmental review, and applicable approval criteria.
  • Engineering reviews streets, sidewalks, grading, stormwater, utilities, transportation, and other infrastructure.
  • Public Works considers how new infrastructure connects to existing City systems and how those systems will be operated and maintained.
  • The Poulsbo Fire Department reviews emergency access, fire apparatus movements, hydrants, and fire flow in coordination with the City.
  • Outside agencies and technical specialists may evaluate wetlands, traffic, geotechnical conditions, trees, archaeology, public health, or other specialized issues.
  • Later, Building reviews detailed construction plans and conducts inspections.


It is all one development project, but each reviewer is looking at a different piece of the puzzle. Those individual reviews are coordinated to determine whether the overall proposal meets applicable standards and decision criteria.


This team approach also helps explain why projects may change during review, why additional information or revised plans are sometimes required, and why receiving one approval does not necessarily mean a project is ready for construction.

2027 Comprehensive Plan Amendments

The City of Poulsbo Planning and Economic Development (PED) Department is now accepting applications for amendments to the City’s Comprehensive Plan to be considered during the 2027 annual amendment cycle.


The Comprehensive Plan is the City’s long-range policy document that guides how Poulsbo grows and develops over time. It addresses topics such as land use, housing, transportation, economic development, parks, utilities, and other community priorities. Because the Comprehensive Plan provides the foundation for many of the City’s development regulations and long-term investments, changes to the Plan are considered through a formal amendment process.


Comprehensive Plan Amendments may include proposed changes to the text or policies of the Plan, amendments to Comprehensive Plan maps, or site-specific land use re-designation requests. For example, a property owner may request a change to the future land use designation of a particular property, or an amendment may propose changes to broader policies that apply citywide.


Rather than considering amendments individually throughout the year, proposed amendments are generally collected and reviewed together as part of the City’s annual amendment cycle. Applications submitted for the 2027 cycle will go through the City’s established review process, which includes opportunities for public review and consideration before a final decision is made.


The deadline to submit an application for the 2027 cycle is 4:30 p.m. on Monday, November 16, 2026.


Application forms, submittal requirements, and additional information are available on the City of Poulsbo’s Comprehensive Plan Amendments webpage.


For more information, contact Nikole Coleman, Planning Manager, at ncoleman@poulsbo.gov.

In the Queue

The following projects are currently under review with the PED Department:



  • Ogilvie Boundary Line Adjustment. Notice of Decision issued 9/16.
  • Public Works Maintenance Building SPR. Submitted, not counter complete.
  • Pinnacle PRD/Preliminary Plat. Revisions submitted, under review.
  • Suquamish Care Facility. Prepping staff report. PCPM 10/27.
  • Home 2 Suites Site Plan Review. Revisions submitted, under review.
  • Noll Pointe PRD/Preliminary Plat. Awaiting Hearing Examiner decision.
  • Cedar View PRD/Preliminary Plat. Awaiting Hearing Examiner decision.
  • Viking Commercial. Revisions submitted, under review.
  • Viking Townhomes Development Agreement. Revisions requested 9/4.
  • The Nora and Valari. Revisions requested 9/17.
  • PERC Phase I Building Design Review. Revisions requested 7/29.
  • Poulsbo Middle School Site Improvements. Revisions requested 8/25.
  • PERC Boundary Line Adjustment. Revisions requested 8/28.
  • Liberty Heights Critical Area Review. Under review.
  • Poulsbo Chevron SEPA. Awaiting additional materials.



Check out active land use reviews here.

Above: Initial Public Works Maintenance Facility Site Plan (note, still under review)

In Development

The following projects are currently under construction:

Project Name

General Location

Project

Valvoline

College Marketplace

Drive-thru oil change

Sandstone

Noll Rd

87 single family lots

PERC

NW Reliance St

Sports Fields/Courts

Vaneheimr

Front Street

Mixed-Use Building

AKTIV

Harrison and 9th

Mixed-Use Building

Westerly Apartments

4th Avenue

72 apartments

Plateau at Liberty Bay

Viking Ave South

63 single family lots

Westry Village

College Marketplace

66 townhomes

Liberty View Estates

Johnson Road NE

61 single family lots

Lincoln Cottages

NE Lincoln Rd

21 single family lots

Oslo Bay Apartments

SR 305/Bond/Viking

463 apartments

Winslow Ridge

Rhododendron Ln

86 single family lots

Olympic Overlook

NE Laurie Vei Loop

22 single family lots

Projects under construction for site work (grading, stormwater vaults, installation of sewer lines, etc.) are managed by the Engineering Department. Please contact them for questions or concerns.


Projects under construction for buildings (vertical construction) are managed by the Building Department. Please contact them for questions or concerns.

The Many Roles of PED Staff

Did you know? On top of the larger land use applications, the PED Department staff also responds to public records requests, business license applications, sign permits, tenant improvements, deck permits, grading permits, and code enforcement requests.


For the month of September PED staff reviewed/responded to:


  • 16 Business Licenses
  • 10 Public Record Requests
  • 7 New Single-Family Residences
  • 1 Accessory Dwelling Unit
  • 2 Signs
  • 5 Tree Cutting and Clearing Exemptions
  • 1 Post Decision Review
  • 1 Zoning Verification
  • 1 Shoreline Exemption

Planning Commission Calendar

See below for agenda items for Planning Commission meetings. Please note that agenda items are subject to change. Check the website for the official agenda.


  • October 13 - Cancelled
  • October 27 - Suquamish CARE Center Conditional Use Permit Public Meeting
Planning & Economic Development
200 NE Moe Street | Poulsbo, WA 98370-7347
(360) 394-9748 | fax (360) 697-8269
www.cityofpoulsbo.com | plan&econ@cityofpoulsbo.com