Still Want More Info? 
Want to learn about the work being done by the CCTID?

Come to our next board meeting on Friday, Aug. 9, at 9 a.m., at the Clermont County Engineer's Office.

Tell Us What You Think!
Email: 
 
Phone:
513-835-2417
 
Like us on Facebook

Follow us on Twitter

Members of the CCTID
Jeff Wright -
Chair of the CCTID and Miami Township Administrator
 
Ken Geis -
Vice-Chair of the CCTID and Union Township Administrator
 
Jeremy Evans, P.E., P.S. -
Secretary-Treasurer of the CCTID and Clermont County Engineer
 
Jeff Lykins -
CCTID Board Member and  CEO of Lykins Energy Solutions

Sukie Scheetz -
CCTID Board Member and Assistant County Administrator
 
John Becker -
Ex-Officio Member of the CCTID and State Representative, Ohio's 65th House District
 
Joseph Uecker -
Ex-Officio Member of the CCTID and State Senator, Ohio's 14th Senate District
Project Update: Price Road 
Bridge Replacement 
As a result of damage that occurred to the bridge structure, the Price Road Bridge was closed to all traffic on April 2, 2019. The old structure has been demolished and a new bridge will be built in the same location. 

Design plans for the new bridge are currently under review and in the process of being finalized. Construction is expected to begin by October; the anticipated completion date is March 2020. 

The Price Road Bridge is located in Miami Township and carries approximately 900 vehicles per day between the City of Milford and Loveland-Miamiville Road. The bridge serves as an important access point for several key destinations in the area. 



For more information about this project, visit our website .

***
Quick Bridge Facts by the Numbers:

149
Since 2001, the county has replaced 149 bridges. 

50
A bridge typically has a 50-year functional life expectancy.

182 
Clermont County has 182 bridges built before 1968.

45 
There are 45 load-restricted bridges in the county. The legal load limit for a bridge is 40 tons, otherwise must be posted.