TRAFFIC IMPACT:

The full road closure of North Street at the location of the bridge will remain in effect until October.

The long-term closure period for this bridge has been amended and approved. The new end date for the closure is 10/12/21.

CONSTRUCTION ACTIVITIES:

Drilling will continue next week. The contractor has 5 more piles to complete.


Pedestrian access will be maintained at all times. Traffic control personnel will be onsite to escort pedestrians through the project site safely during working hours.
Installing I-beam into drilled shaft.
Placing concrete around installed I-beam.
LOCATION: Bridge 3 is located on North Street over the Vermont Railway (near Terrace Hill). The bridge is located approximately 0.15 miles north of the junction with Florence Road.

PROJECTED COMPLETION: Fall 2021