Comment on the Farmington and River Roads Intersection through May 3
This intersection of two heavily traveled roads is currently controlled with stop signs. Travelers experience long waits during peak commuting times.
Comments
on the alternatives will be accepted through May 3. Once an alternative is selected, the design will be further developed. A second open house is anticipated for late 2020 or early 2021. Construction is tentatively expected for summer 2021 through spring 2022.