PROJECT UPDATE
Walker Road phase 2

February 2025

Recently completed work:

  • Completed installation of City of Beaverton waterline on Walker Road, between Schendel and 150th avenues, with line extensions on 158th, from Walker to Schendel, and on 150th, from Walker to Conor Circle.
  • Completed installation of new storm pipe and structures along the south side of Walker Road, between Schendel and 158th avenues and between Meadow Drive and Greystone Court.
  • Completed installation of retaining wall along the McDonald's frontage on Walker Road and along the Popeyes frontage on 158th Avenue.
  • Completed installation of sidewalk ramps and stairs at IHOP and Popeyes. These ramps will connect to the new sidewalk, to be installed soon.
  • Completed installation of landscaping at Tualatin Hills Park & Recreation District/City of Beaverton water quality pond.
  • On-going installation of new light pole bases, junction boxes and conduits on the south side of Walker Road, between Koll Parkway/150th Avenue and Schendel Avenue.

Upcoming work:

  • Pressure test and disinfect new waterline.
  • Begin waterline service connections and transfers from Tualatin Valley Water District to new City of Beaverton line.
  • Complete installation of new storm pipe and structures along the south side of Walker Road, between Greystone Court and 158th Avenue, including laterals across Walker Road.
  • Install curb, gutter and sidewalk along south side of walker Road, between Schendel and 158th avenues, including portions of Outrigger Terrace.
  • Install new curb, gutter and sidewalk along the south side of Walker Road, between Meadow Drive and Koll Parkway/150th Avenue and Schendel Avenue.
  • Continue to install new light pole bases, junction boxes and conduits along the south side of Walker Road, between Koll Parkway/150th Avenue and Schendel Avenue.
  • Install street lights (luminaires).

Visit wc-roads.com for more traffic updates.

Traffic impacts:

You may have noticed the significant grade change between Meadows Drive and Butner Road. This is part of the design, due to eliminating a superelevated curve (think racetrack turn) that is being replaced by a normal road cross section.


Speed limit:


The posted speed limit has been reduced in the construction zone to 35 mph for safety.


Drivers:


Traffic has been reduced to one lane in each direction in some areas, but is opened up at intersections.


Pedestrians:


Sidewalks remain closed along the south side of Walker Road. Pedestrians are directed to use the sidewalks on the north side of Walker Road throughout the work area.


Bicyclists:


Striped bike lanes have been installed where they can be accommodated. In certain locations, bicyclists are to share the travel lane with vehicles.

 

Transit:


All stops for Routes 67 (Bethany/158th) and 59 (Walker/Park Way) are open though there may be temporary disruptions to stops due to current construction activities. Route 67 (Stop ID #6832) adjacent to Tualatin Hills Howard Terpenning Complex has been restored and is now open.


Visit wc-roads.com for more traffic updates.

Thank you for slowing down in work areas!


As with all construction projects, we apologize for the temporary inconvenience and appreciate your patience and understanding.