We are aware that recent heavy rains created localized flooding and street ponding near the roundabout, and have conducted field checks on site.

The reason the rainwater backed up was due to erosion control socks that had not yet been removed from the construction site, which prevented the water from draining properly. The rolls of erosion control sock have since been removed, so rain water will be able to drain properly during future rain events.

Please don't hesitate to contact us if you have any questions.