CURRENT REGAL PROJECT
We are excited to share our involvement in a large-scale commercial construction project located in Hoboken, New Jersey, which commenced August 2019 and is scheduled to be completed in July 2020. The broad scope of the project is to remove an existing 4-story structure in order to make a larger addition to the current school, which will be connected by a newly constructed bridge. The following is a comprehensive list of work that will be completed during the year long project:
·
Interior removal of walls and plaster;
·
Modify the front entrance previously used as a fire exit;
·
Install ADA lift;
·
Install window film on two adjacent buildings for safety;
·
Protect pavers from damage;
·
Install pedestrian sidewalk bridge;
·
Install shoring to reinforce the preserved area from collapsing, or cracking;
·
Saw cut from first floor to roof, to separate historical façade;
·
Demolition from fourth floor to foundation;
·
Excavate new footings;
·
Build exterior block walls, interior walls and new floors (for bridge access);
·
Install new roof rafters;
·
Mechanical, HVAC, plumbing, electrical, sprinkler, and fire alarm system work;
·
Install new exterior doors and windows;
·
Fire block and insulation to be installed;
·
Install interior doors;
·
Sheet rock interior walls and paint;
·
Stucco exterior block.