Runway 08R/26L (formerly known as Runway 07R/25L) at Long Beach Airport will be reopening for aircraft operations effective Friday, October 5 at 12:00 p.m.

The runway has been closed for reconstruction since January 2018. The community is advised that aircraft operations will be reinstated in areas that have not experienced aircraft activity in almost 9 months.