|
The AER has finalized the Directive 051 changes that were circulated for feedback earlier this year. The revised directive now formally classifies high-water-content hydraulic fracturing flowback as a Class II fluid and establishes requirements for its deepwell disposal.
Other updates include clearer criteria for Class 1a and Class 1b disposal wells, recognition of additional fluids that may qualify for Class II disposal, a new requirement related to minimizing cellar space, and confirmation that disposal fluids identified on the Well Summary form must originate from an Alberta source.
A reminder that the packer is expected to be within 15 meters (TVD) above of the top of injection perforations unless technically justified. While this new Directive does not explicitly indicate a cellar space requirement, it should be noted that the length of open casing below the bottom perforations is typically also no more than15 meters (TVD) unless technically justified (for example, see Application Checklist for CO2 EOR Storage) .
Bulletin 2026-31 | Alberta Energy Regulator
|