On the construction side, the DeLeers group will be back in the next several weeks to assess the tightness of the roof as it has gone through our winter without the coating. There have been a few, minor leaks detected, which will be closed before the roof is coated. The coating of the roof is anticipated to occur in May when the weather is more favorable. Following the coating, DeLeer’s crews will be inside to repair the water damage that occurred over the past several years.
Thanks to your very generous donations, to date we have raised $160,184 and have covered the projected costs. However, we must raise $64,816 in additional funds to cover projected costs.
We are not sure of when we will be allowed to reopen. When we do, it will be in a facility that will function with greater energy efficiency.