Spring is here, and with it comes important work to improve roads and essential services throughout Georgina. These investments protect our shoreline, modernize aging infrastructure and support safer, more connected neighbourhoods.

High Street improvements in Sutton

Major streetscape and infrastructure upgrades are planned for High Street in downtown Sutton to support the long-term vitality of the community’s Business Improvement Area (BIA). Phase one of the project includes replacing aging watermains, bridge rehabilitation and reconstructing the road with new sidewalks and curbs.


Construction in 2026 will focus on sections outside the BIA, from Dalton Road to River Street and from West Street to Highway 48. These upgrades will strengthen essential water, wastewater and stormwater infrastructure and prepare the area for future streetscape improvements that will enhance the downtown Sutton BIA. Stay updated at georgina.ca/HighStreet.

Duclos Point drainage improvements

To address routine flooding in this low-lying area, the Town is restoring stormwater drainage along Duclos Point Road. Planned work includes rehabilitating existing ditches and culverts, upgrading outfalls and installing new pumping infrastructure to manage heavy storms. Find out how stormwater is managed in Georgina at georgina.ca/stormwater.

Station Road drainage improvements and Old Homestead multi-use path

Improvements along Station Road will include new curbs, sidewalks and stormwater features to improve drainage, enhance safety and reduce ongoing maintenance needs. The project also includes a new multi-use path along Old Homestead Road that will connect neighbourhoods to the Pefferlaw River pedestrian bridge and the regional trail network. Safety features will include speed humps, new signage and a dedicated pedestrian crossing to support safer walking and cycling in the area. Find more information at georgina.ca/StationRoad.

Udora roads rehabilitation

The Town is rehabilitating roads throughout Georgina as part of the annual Pavement Management Program to maintain service levels, extend road life and support safe, reliable travel. In Udora, the first phase of gravel road reconstruction will renew Linda Road, Narva Avenue, Estonian Road and Umera Avenue. This marks the beginning of a long-term effort to improve road conditions in the community. Learn more at georgina.ca/UdoraRoads.

β€Š

Explore the project dashboard and map

Want to view all the infrastructure and construction projects happening throughout Georgina? You can find project locations and learn what improvements are planned in your area on the Town's Project Dashboard and Map. Check out some of the projects happening this construction season:

  • Queensway South and Golfview watermain renewal – Aging cast iron watermains will be replaced to improve reliability, maintain water pressure and reduce service disruptions. This work will be coordinated with planned road improvements to limit impacts.
  • Hadden Road improvements – Hadden Road will be fully reconstructed with improved pavement, drainage and intersection upgrades to support increasing traffic in the area. The project will also add a multi-use path along the corridor, improving safety and expanding options for walking and cycling.
  • Alice Avenue drainage improvements – The Town is replacing culverts along Alice Avenue and Boyers Road and rehabilitating roadside ditches to improve stormwater drainage and increase the capacity of the existing system. These upgrades will help manage heavy rainfall and reduce localized flooding in the area.
  • Lake Drive North revetment – The Town is strengthening a stretch of Lake Drive North with a natural stone revetment to reduce shoreline erosion, protect the narrow roadway and improve long-term safety.


Learn about these projects and more at georgina.ca/CapitalProjects.

β€Š

What to expect

As work gets underway, you may notice:

  • Temporary lane reductions or detours
  • Periodic road closures
  • Construction noise during working hours
  • Short-term impacts to driveway access or water service (where applicable)ο»Ώ

Advance notice will be provided wherever possible, and updates will be shared as they become available. Learn more about the Town's infrastructure, facilities, water and road projects at buildinggeorgina.ca.

β€Š

Work zone safety

Construction zones are active work areas. Follow posted signage, be mindful of crews working nearby and slow down while driving. We understand disruptions can be frustrating, but these precautions help keep everyone safe.

β€Š

York Region projects

Georgina Water Treatment Plant

York Region is doing upgrades to improve water infrastructure at the Georgina Water Treatment Plant and Pumping Station, along with replacement of the mussel control piping in Lake Simcoe. Work will take place from spring 2026 to winter 2027.


What to expect:

  • No impacts to water services.
  • Willow Wharf Park will be closed to accommodate construction.
  • Closure of Kennedy Road at Lake Drive East with temporary traffic signals. Access to all homes and businesses maintained via Metro Road.

Regional road construction

  • Metro Road from Morton Avenue to Boyers Sideroad – Road rehabilitation
  • Ravenshoe Road from Concession 5 to Weirs Sideroad – Road preservation


Visit York Region's road construction schedule for more information.

β€Š
β€Š
β€Š

Town of Georgina | georgina.ca

β€Š
Facebook  X  Instagram  Linkedin  

From parking passes to burn permits, explore the Town’s convenient online services that make it easy to pay, apply and connect. georgina.ca/OnlineServices.

Looking to reach out? Visit georgina.ca/ContactUs.

X Share This Email
LinkedIn Share This Email
β€Š