Center Infrastructure Improvement Project Newsletter

Two-Week Look Ahead Schedule

As work continues in West Hartford Center, the following construction activities are anticipated along Farmington Avenue over the next two weeks.


May 18 – May 22

Phase 2

  • Continue removing existing sidewalk pavers, roadway surface, and curb.
  • Continue tree stump removal.
  • Continue installing soil cells.
  • Continue electrical-related work, including handholes, light pole conduits, and other conduit work as needed.
  • Begin storm drainage installation.


Phase 3

  • Continue fine grading sidewalk areas.
  • Install curb and pour sidewalks and crosswalks.
  • Complete and backfill drainage work on Dale Street.
  • Dale Street may be temporarily closed at times during the day while this work is taking place.
  • Electrical crews will be on site for conduit work as needed.


May 25 – 29 (Please Note: No work on May 25th, in observance of Memorial Day)

Phase 2

  • Continue removing existing sidewalk pavers, roadway surface, and curb.
  • Begin grading sidewalk areas.
  • Prepare for granite curb installation.
  • Continue installing handholes and conduits.
  • Continue storm drainage installation.
  • Electrical crews will be on site for conduit work as needed.


Phase 3

  • Continue fine grading sidewalk areas.
  • Install curb and complete sidewalk and crosswalk pours.
  • Complete paving around the curb line and Dale Street.
  • Dale Street may be temporarily closed at times during the day while this work is taking place.
  • Remove barrels and fencing from completed areas.


Phase 5

Following the substantial completion of Phase 3, crews may begin work at the west end of this phase.

  • Mobilize equipment and materials to the area.
  • Set up sidewalk fencing and cones around the active work zone.
  • Construction fencing will be adjusted as work progresses.
  • Begin removing existing sidewalk pavers, roadway surface, and curb.
  • Begin installing soil cells.
  • Begin installing handholes and conduits.


Please note: All activities are weather dependent.

View the updated project phasing plan here to see when construction is expected in each section of Farmington Avenue.

Business Spotlights

From longtime favorites to new neighborhood additions, get to know the businesses that add to West Hartford’s character, charm, and sense of community.

Hope & Stetson

982 Farmington Avenue



A locally loved women’s boutique known for its thoughtfully curated fashion, cozy atmosphere, and welcoming community spirit. From timeless denim and effortless everyday styles to unique gifts and accessories, Hope & Stetson offers something special for every generation.


What truly sets the boutique apart is its heartfelt mission to create a space where customers feel at home the moment they walk through the door. Rooted in family values, inclusion, and local connection, this Farmington Avenue gem continues to make shopping a joyful and personal experience in the heart of West Hartford.


https://hopeandstetson.com/


BK&CO

983 Farmington Avenue



For more than 30 years, BK&Co. has brought timeless style, personalized service, and a sense of community to West Hartford Center. Founded by lifelong friends Barbara Karsky and Karen Herbert, the boutique is known for its carefully curated women’s fashion, expert styling, and welcoming atmosphere that makes every customer feel like a longtime friend.


From everyday essentials to standout occasion pieces, BK&Co. blends sophistication with comfort while helping women feel confident and empowered in their personal style. Rooted in friendship, fashion, and exceptional customer care, this beloved Farmington Avenue boutique continues to be a staple destination for shoppers looking for a truly personal shopping experience.


https://bkcostyle.com/


Hard Hats Meet Hashtags

For photos from the West Hartford Center Project, follow us on Instagram. Stay informed about ongoing work, progress, and what’s next for the project!

Stay Informed: Sign Up for Text Alerts

Community members and business owners can opt in to receive SMS text alerts for time-sensitive West Hartford Center Construction Project updates, including traffic impacts and schedule changes. Enroll and stay informed throughout construction.

ATTENTION: Local Businesses - Get the Business Toolkit

Signage to Help Keep Your Business and Customers Informed!

In this Toolkit:

  • Business Rack Cards - Tips
  • Business Placards - Click link below to see customized window and/or cash wrap signage for your industry!

If you need additional copies of outreach materials, such as window signs, or have any questions, please feel free to contact us at CenterConstruction@westhartfordct.gov — we’re happy to assist.

The Retail Validation Program:

A Reduced Rate Employee Parking Option for Your Staff

As construction progresses, we're working to maximize on-street parking for customers and visitors. To help, we encourage employees to use alternative parking options, including the Town Center Parking Garage, which offers reduced rates for retail and restaurant employees working in the Center.


The Town Center Garage rates are far lower than other options! The rates are $4.50 for up to an 8.5-hour shift and $7 for anything over 8.5 hours.


For more information, contact Kristen Gorski, Economic Development Manager, at kristen.gorski@westhartfordct.gov.

Stay Informed and Ahead of the Curve

For the latest updates and important information about the project, visit our project webpage. It’s your go-to resource for all the news, timelines, and tools to help your business navigate the construction period smoothly.

Have questions or feedback? We’re here to help—email us at CenterConstruction@westhartfordct.gov