Center Infrastructure Improvement Project Newsletter

Two-Week Look Ahead Schedule

Week of April 6 – April 10

Farmington Avenue

Phase 1

  • Concrete sidewalk removal in front of 1000 Farmington Avenue storefronts (anticipated April 9–10).
  • A temporary compacted gravel walkway will be installed until new concrete is placed.
  • Driveway preparation and concrete placement at 1000 Farmington Avenue (weather dependent).
  • Please note: the driveway is expected to be closed April 7–9.
  • Backfilling and preparation for asphalt paving in the 1000 Farmington Avenue parking lot
  • Fine grading in sidewalk areas
  • Preparation for soil cell wall installation
  • Installation of light bases
  • Drainage installation and backfilling on Walden Street and Dale Street
  • Dale Street may experience temporary daytime closures during active work
  • Concrete placement operations
  • Electrical/conduit work, as needed


Phase 3

  • Continued drainage installation and backfilling on Dale Street
  • Temporary daytime closures may occur
  • Ongoing maintenance and protection of traffic (MPT), including sidewalk fencing and cones
  • Fencing will be installed in stages to minimize impacts
  • Continued installation and backfilling of handholes and conduits
  • Ongoing sidewalk demolition
  • Continued soil cell installation
  • Electrical/conduit work, as needed


Week of April 13 – April 17

Farmington Avenue (General)

  • Road coring at various locations along Farmington Avenue
  • The exact date will be shared once determined
  • Traffic control will be in place, including a police officer directing traffic. Some congestion should be expected.

Phase 1

  • Fine grading for sidewalks
  • Concrete sidewalk installation at 1000 Farmington Avenue storefronts (anticipated April 13, weather dependent)
  • Placement of topsoil within soil cells
  • Reinstallation of paver bricks
  • Installation of light bases
  • Sawcutting and asphalt paving operations
  • Electrical/conduit work, as needed


Phase 3

  • Continued MPT setup (sidewalk fencing and cones installed in stages)
  • Continued installation and backfilling of handholes and conduits
  • Ongoing sidewalk demolition
  • Continued soil cell installation
  • Electrical/conduit work, as needed


Reminder

Please note that all construction activities are weather dependent, and work levels may vary throughout the spring season. We appreciate the community’s continued patience and support as these improvements move forward.

View the updated project phasing plan here to see when construction is expected in each section of Farmington Avenue.

Business Spotlights

Yemerica Coffee | 1000 Farmington Avenue Suite 100



Yemerica Coffee brings the rich heritage of Yemeni coffee to the local community, offering an authentic experience rooted in centuries-old traditions. Known for its premium, single origin beans and bold, aromatic flavor profiles, the café blends traditional Yemeni brewing methods with a modern coffeehouse atmosphere. From spiced coffees and specialty drinks to handcrafted pastries, each offering reflects a deep commitment to quality, culture, and hospitality. Yemerica Coffee invites guests to slow down, connect, and enjoy a unique coffee experience that celebrates both history and innovation.


https://www.yemericacoffee.com/

The Fix IV Therapy | 1000 Farmington Avenue Suite 110



The Fix IV Therapy is a wellness-focused clinic dedicated to helping clients feel revitalized, rehydrated, and recharged through innovative IV vitamin therapy. Specializing in intravenous infusions and intramuscular booster injections, the practice delivers essential vitamins, minerals, and nutrients directly into the bloodstream for fast and effective absorption. Their services are designed to support energy levels, enhance mood, improve hydration, and promote overall health in a comfortable, spa-like environment. With an emphasis on personalized care and a holistic approach, The Fix IV Therapy provides a modern solution for those looking to optimize their wellness and recovery.


https://thefixivtherapy.com/

Sidewalk Improvement Update

As part of the ongoing West Hartford Center infrastructure improvements, the Town would like to share an update on upcoming sidewalk work in front of the 1000 Farmington Avenue storefronts.


The contractor is currently scheduled to remove the existing concrete sidewalk between April 9 and April 10, at which time a temporary gravel surface will be in place. Installation of the new concrete sidewalk is anticipated for April 13.


Throughout construction, access to businesses will be maintained. ADA-compliant accommodations will remain in place at all times, including during the concrete curing period, to help ensure safe and convenient entry for customers and visitors.


To help reduce disruption, the contractor plans to perform this work during the early morning hours, with the goal of completing daily activities before most businesses open.


The Town and project team appreciate the continued cooperation of West Hartford Center businesses during construction. Business owners are encouraged to share any information regarding operating hours, delivery schedules, peak activity times, or specific access needs so the team can coordinate the work as effectively as possible and minimize impacts wherever feasible. This can be done by emailing CenterConstruction@westhartfordct.gov.


Thank you for your patience and partnership as these improvements continue to take shape.

Stay Informed: Sign Up for Text Alerts

Community members and business owners can opt in to receive SMS text alerts for time-sensitive West Hartford Center Construction Project updates, including traffic impacts and schedule changes. Enroll and stay informed throughout construction.

ATTENTION: Local Businesses - Get the Business Toolkit

Signage to Help Keep Your Business and Customers Informed!

In this Toolkit:

  • Business Rack Cards - Tips
  • Business Placards - Click link below to see customized window and/or cash wrap signage for your industry!

If you need additional copies of outreach materials, such as window signs, or have any questions, please feel free to contact us at CenterConstruction@westhartfordct.gov — we’re happy to assist.

The Retail Validation Program:

A Reduced Rate Employee Parking Option for Your Staff

As construction progresses, we're working to maximize on-street parking for customers and visitors. To help, we encourage employees to use alternative parking options, including the Town Center Parking Garage, which offers reduced rates for retail and restaurant employees working in the Center.


The Town Center Garage rates are far lower than other options! The rates are $4.50 for up to an 8.5-hour shift and $7 for anything over 8.5 hours.


For more information, contact Kristen Gorski, Economic Development Manager, at kristen.gorski@westhartfordct.gov.

Stay Informed and Ahead of the Curve

For the latest updates and important information about the project, visit our project webpage. It’s your go-to resource for all the news, timelines, and tools to help your business navigate the construction period smoothly.

Have questions or feedback? We’re here to help—email us at CenterConstruction@westhartfordct.gov