Naaman School Road
This project will include the reconstruction of Naaman School Road from a
two-lane roadway into a four-lane divided street stretching from Brand Road to State Highway 78 (Lavon Drive). This plan includes raising the road over Spring Creek, while creating an enclosed storm drain system and a hiking trail along the north side of the roadway.
The project has been progressing with franchise utility relocations currently underway. They will continue over the next couple of months and roadway construction is scheduled to begin this fall. This project will alleviate road congestion by providing twice the number of travel lanes in each direction and alleviate flooding issues during significant rainfall.