RELEASE: IMMEDIATE
CONTACT:
Darragh Frye
540-907-8409 cell
| |
|
VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
June 11 – 17, 2023
All work is scheduled weather permitting. Real-time information on work zones and lane closures is available on 511Virginia
| |
I-95 Northbound
Exit 110 (Ladysmith)
Sunday – Tuesday, 9 p.m. – 5 a.m. Mobile lane closures for paving between mile markers 108-111 near the Ladysmith I-95 interchange in Caroline, and along the interchange on- and off-ramps. Law enforcement will assist with traffic control.
Exit 133 (Falmouth/Warrenton) to Exit 136 (Centreport Parkway)
Monday – Friday, 9 p.m. – 4:30 a.m. and Friday – Saturday, 10 p.m. - 5 a.m. Single lane closure between interchanges for 95 Express Lanes Fredericksburg Extension construction.
| |
Stafford County
Route 17/Route 17 Business Northbound
Sunday – Saturday, 8 p.m. – 7 a.m. Alternating lane closures on Route 17 northbound and Route 17 Business northbound for beam placement at I-95 overpass. Intermittent full traffic stops from 11 p.m. to 3 a.m. for up to 30-minute intervals. If work is required from Friday evening into Saturday morning, the full stop will occur from midnight to 3 a.m. Saturday. Construction for I-95 Northbound Rappahannock River Crossing project.
Route 17/Route 17 Business Southbound
Sunday – Saturday, 7 p.m. – 6 a.m. Alternating lane closures on Route 17 southbound and Route 17 Business southbound for beam placement at I-95 overpass. Intermittent full traffic stops from 11 p.m. to 3 a.m. for up to 30-minute intervals. If work is required from Friday evening into Saturday morning, the full stop will occur from midnight to 3 a.m. Saturday.
Route 626 (Leeland Road)
Monday – Wednesday, 7 a.m. – 7 p.m. Maintenance work on the bridge over CSX railroad tracks. One-way, alternating traffic, directed by a flagging crew.
Route 628 (Eskimo Hill Road)
Wednesday – Friday, 7 a.m. – 7 p.m. Maintenance work on the bridge over CSX railroad tracks. One-way, alternating traffic, directed by a flagging crew.
Secondary Road Resurfacing
Monday – Wednesday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing in the Settlers Landing subdivision. Flaggers will direct alternating one-way traffic near the mobile work zone.
Mourning Drive
Monday – Thursday, 7 a.m. – 5 p.m. Pipe repair. Flaggers will direct alternating one-way traffic through the work zone.
| |
Spotsylvania County
Route 17 (Mills Drive)
Monday – Tuesday, 9 p.m. – 4:30 a.m. Traffic signal work at Route 17 (Mills Drive) and Germanna Boulevard. Law enforcement will direct traffic through the intersection.
Route 208 (Courthouse Road and Lake Anna Parkway)
Monday – Thursday, 9 a.m. – 3 p.m. Mobile lane closures to install rumble strips and pavement edge lines on multiple sections of Route 208 between the Louisa County line and Smith Station Road.
Route 612 (Pawmunkey Road)
Sunday – Friday, 7 p.m. – 6 a.m. Milling and paving between Post Oak Road and W. Catharpin Road with one-way, alternating traffic, directed by a flagging crew through the work zone.
Secondary Road Resurfacing
Tuesday – Friday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing in the Heatherstone and Woodside subdivisions. Flaggers will direct alternating one-way traffic near the mobile work zone.
| |
Caroline County
Route 207 (Rogers Clark Boulevard)
Tuesday – Wednesday, 9:30 a.m. – 3:30 p.m. Alternating lane closures on Route 207 to allow crews to take soil samples near the bridges over the Mattaponi River.
Route 618 (Alps Drive/Beverly Run Road)
Monday – Wednesday, 7 a.m. – 7 p.m. Mobile lane closure for road resurfacing. Flaggers will direct alternating one-way traffic in the work zone on Alps Drive between Lauraville Road and Sparta Road. On Beverly Run Road, work zone will be between Sparta Road and Passing Road.
| |
Essex County
Secondary Road Resurfacing
Wednesday – Friday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing. Flaggers will direct alternating one-way traffic in the work zone on the following secondary routes:
Route 606 (Fairfield Lane)
Route 607 (Cheaneys Bridge Road)
Route 633 (Hunters Hill Road)
Route 640 (Ullainee Road)
Route 670 (Broadhurst Road)
Route 726 (Deep Landing Road)
| |
Gloucester County
Route 216 (Guinea Road)
Monday – Saturday, 7 a.m. – 7 p.m. Starting Monday, June 12, reconstructive maintenance work will begin to strengthen the travel surface of Route 216 (Guinea Road). Expect one-way, alternating traffic on Guinea Road between Route 17 and Maryus Road. Read the release here.
| |
King George County
Route 3
Sunday – Friday, 7 p.m. – 5 a.m., and Monday – Friday, 9 a.m. – 3 p.m. Mobile work zone with single lane closures for overnight milling and paving between Route 205 and Route 301. Temporary pavement markers may be placed during daytime hours. Flaggers will direct drivers through the work zone.
Route 301 Northbound
Starting at midnight on Sunday, June 11, long-term lane closure on Route 301 northbound at the bridge over Pine Hill Creek for pipe repair. Pine Hill Creek is located between Route 205 and Route 3.
| |
King William County
Route 30
Sunday – Thursday, 7 p.m. – 7 a.m., Mobile work zone with single lane closures for overnight milling and paving between Industrial Park Drive and Route 33. Flaggers will direct drivers through the work zone.
| |
Lancaster County
Sign Work
Tuesday – Friday, 6 a.m. – 3 p.m., Sign work with flagging operation at the following intersections:
Route 3 and Goodluck Road.
Crawfords Corner Road and Carlson Road
Taylors Creek Road and Lumberlost Road
Pavement Markings
Thursday – Friday, 7 a.m. – 4 p.m., Mobile operation with lane closures to allow crews to apply pavement makings on the following secondary routes: 604, 605, 607, 608, 613, 614, 615, 617, 629, 630, 639, 641, 642, 647, 648, 650, 652, 695, 675, 709, 757, 759, 788, 790, 1016, 1036 and F689.
| |
Mathews County
Route 609 (Bethel Beach Road)
Tuesday – Wednesday, 7 a.m. – 7 p.m. Mobile lane closures with one-way alternating traffic on Bethel Beach Road for road resurfacing work between Hamburger Road and Bashi Shores Road.
| |
Middlesex County
Route 17 (Tidewater Trail)
Monday – Tuesday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing work on Tidewater Trail. Crews will be milling, paving and applying pavement markings.
Route 227 (Urbanna Road)
Monday – Friday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing work on Urbanna Road between Route 33 and Beryl R. Newman Memorial Bridge. Crews will be milling, paving and applying pavement markings.
Route 616 (Town Bridge Road)
Monday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing work on Town Bridge Road to allow crews to place shoulder stone. Alternating, one-way traffic near the work zone between Zion Branch Road and Route 17.
| |
Northumberland County
Secondary Road Resurfacing
Monday – Friday, 7 a.m. – 7 p.m. Mobile lane closures along the following routes as crews complete road resurfacing. Flagging crews will direct one-way, alternating traffic on the following routes:
Route 608 (Jarvis Point Road)
Route 669 (Bluff Point Road)
Route 672 (Painter Point Road)
Route 676 (Logan Lodge Road)
Route 716 (Kent Cove Road/Windy Lane)
Route 804 (Roland Road)
Pavement Markings
Tuesday – Thursday, 7 a.m. –4 p.m., Mobile operation with lane closures to allow crews to apply pavement makings on the following secondary routes: 600, 604, 607, 608, 609, 614, 616, 617, 621, 622, 624, 627, 636, 642, 644, 646, 647, 649, 652, 657, 659, 669, 671, 695, 702, 1005, 1016 and 1175.
| |
Westmoreland County
Route 205 (James Monroe Highway)
Sunday – Thursday, 7 p.m. – 7 a.m. Alternating lane closures between the Westmoreland/King George County line and Route 3 for milling and asphalt patching work. Flagging crews will direct one-way, alternating traffic.
| |
Additional Projects in Fredericksburg District
Caroline County
Route 1 over South River Bridge Rehabilitation
Construction started in Feb. 2023 on a $4 million project to rehabilitate the Route 1 bridge over the South River, which is located in the Ladysmith area. The condition of the 97-year-old bridge will be improved through substructure and superstructure repairs, and installation of a new, smoother travel surface. Route 1 is reduced to two lanes to accelerate construction. All lanes will reopen in July 2024, when construction is anticipated to be complete.
Route 639 (Ladysmith Road) Widening
Construction is underway to widen Route 639 (Ladysmith Road) to four lanes between I-95 and just west of Route 1. A new raised median will separate eastbound and westbound lanes to allow for improved movement through the corridor. Additional left and right turn lanes will be built on Ladysmith Road at the Route 1 intersection. A shared use path, sidewalks, crosswalks, and pedestrian crossing equipment will be installed. The project is expected to be complete in May 2024.
Essex County
Route 612 (Bestland Road) Bridge Replacement Project
Route 612 (Bestland Road) is closed to through traffic through late June 2023 to replace a bridge over Dragon Run. The project is replacing the previous timber deck bridge with a new 48-foot concrete slab structure on concrete abutments and piles. Click here to view an online detour map.
|
King George County
Route 206 and Route 218 Turn Lane
This project is building a dedicated right turn lane from westbound Route 206 (Dahlgren Road) to westbound Route 218 (Caledon Road). The existing travel lane will be marked as a through lane to go straight or turn left onto Route 632 (St. Paul’s Road). The project will be complete in October 2023.
Route 301 and the Nice-Middleton Bridge Replacement Project
The new Nice/Middleton Bridge is now open to traffic over the Potomac River. Road work continues on Route 301 near the approaches. Read MDTA’s release here.
|
King and Queen County and King William County
Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure
Dorrell Road and Spring Cottage Road are closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. The road will remain closed until further notice for an emergency bridge repair project. During a routine inspection, crews identified significant deterioration in key bridge elements, and the bridge was closed in March 2023 for motorist safety. Motorists should follow signs posted along the detour route.
Mathews County
Route 223 (Old Ferry Road) over Milford Haven at Gwynn's Island
Temporary traffic signals are installed on Route 223 at each approach to the bridge over Milford Haven. One-way, alternating traffic will remain in place, controlled by the temporary signals, through fall 2023 due to a bridge maintenance project. Bridge openings for marine traffic have resumed at six scheduled times a day.
|
Richmond County
Route 637 (County Bridge Road)
County Bridge Road is closed to through traffic at the bridge over Cat Point Creek due to damage following heavy rain and flooding in summer 2021. A bridge replacement is under construction. County Bridge Road will remain closed to through traffic until the new bridge reopens by April 26, 2024.
Spotsylvania County
I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound
Construction is underway to build a second right turn lane from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic from side streets. Additional right turn lane added to Southpoint Parkway approaching Route 1. Project completion in August 2025.
Route 1 and Market Street
Construction is underway to build triple left turns from westbound Market Street to Route 1 southbound, with a fourth lane on Market Street becoming a shared through/right turn lane. A shared through/right turn lane on Route 1 southbound at the intersection will tie into the I-95 northbound on-ramp at exit 126, south of the intersection. New sidewalks will be added along westbound Market Street, on Route 1 southbound, and along a short area on Route 1 northbound. Crosswalks will span Market Street and Route 1, controlled by pedestrian crossing signal equipment. Project completion in December 2023.
Route 1 and Commonwealth Drive
Be alert for construction activity on Route 1 near the Commonwealth Drive intersection, where work is underway to build a nearly 700-space Park & Ride commuter lot. Be alert for work zone barriers along the shoulders of Route 1, and for lanes shifted east near the Commonwealth Drive intersection. Project completion is anticipated in early June 2023.
Route 17 (Mills Drive) Overpass Replacement and Widening
Construction started in Dec. 2020 to replace the existing two-lane interstate overpass on Route 17 with a four-lane bridge. Route 17 will be widened to four lanes until just east of the Hospital Boulevard/Germanna Point Drive intersection. Sidewalk, a shared use path, and pedestrian crossing equipment will be added as part of the project. Improvements will be completed in Feb. 2024.
Route 208 (Courthouse Road) and Hood Drive
On Hood Drive, new right and left turn lanes are under construction at the U.S. Veterans Health Administration outpatient clinic under construction. Additional turn lanes will be built on northbound Hood Drive approaching Courthouse Road. A raised median on Hood Drive will separate northbound and southbound traffic between Courthouse Road and McGowan Drive. Additional sidewalks, crosswalks, and pedestrian crossing equipment will be installed at the intersection. Project completion in June 2024.
Route 606 (Mudd Tavern Road) Widening
Construction recently began to widen Mudd Tavern Road to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Route 606 (Mudd Tavern Road/Morris Road) is reduced to a single lane approaching the traffic signal at the Route 1 intersection through spring 2024 to allow space for widening activities. Project completion in May 2025.
Westmoreland County
Route 658 (Monroe Bay Circle)
Route 658 (Monroe Bay Circle) is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a replacement project is advanced. The road was closed to through traffic from late December 2022-March 2023 after a hole formed in the road, following a pipe failure at the crossing of Monroe Creek.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.
(END)
View as Webpage
| | | | |