RELEASE: IMMEDIATE 



CONTACT:

Alexis Breeden

540-547-1752 cell

May 26, 2023



VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

May 28 – June 3, 2023

All work is scheduled weather permitting. Real-time information on work zones and lane closures is available on 511Virginia


Most lane closures will be lifted in highway work zones from noon Friday, May 26 to noon Tuesday, May 30 for the Memorial Day holiday travel period

I-95 Northbound


Exit 133 (Garrisonville Road) to Exit 136 (Centreport Parkway)

Tuesday Friday, 9 p.m. – 4:30 a.m. Single lane closure starting at 9 p.m. and doubles at 10 p.m. for 95 Express Lanes Fredericksburg Extension construction.


Friday - Saturday, 10 p.m. - 5 a.m. Single lane closure.


Exit 110 (Ladysmith)

Wednesday – Thursday, 9 p.m. – 5 a.m. Mobile lane closures for paving between mile markers 108-111 near the Ladysmith I-95 interchange in Caroline County, and along the interchange on- and off-ramps. Law enforcement will assist with traffic control.

I-95 Southbound


Exit 143 (Garrisonville Road) to Exit 140 (Courthouse Road)

Tuesday Thursday, 9 p.m. – 4:30 a.m. and Friday - Saturday, 10 p.m. - 5 a.m. Single lane closure for 95 Express Lanes Fredericksburg Extension construction.


Exit 130 to Exit 126 (Spotsylvania)

Wednesday – Thursday, 7 a.m. – Noon. Single mobile lane closure at mile marker 129 in Spotsylvania. Interstate maintenance.


Exit 126 (Spotsylvania) to Exit 118 (Thornburg)

Tuesday - Thursday, 9 p.m.4:30 a.m. Single and double lane closures at mile marker 125. Single lane closure begins at 9 p.m. followed by double lane closures at 10 p.m. for construction to replace the Route 17 (Mills Drive) overpass of I-95.

Stafford County


Route 626 (Leeland Road)

Tuesday – Friday, 7 a.m. – 7 p.m. Maintenance work on the bridge over CSX railroad tracks. One-way, alternating traffic, directed by a flagging crew.


Route 3  

Monday – Friday, 9 a.m. – 3 p.m. Lane closures and shoulder closures for utility work between Dairy Lane and Rumford Road. 


Mobile Pavement Marking

Tuesday – Thursday, 8 p.m. – 5 a.m. Stay alert for slow-moving equipment and expect brief delays as crews refresh pavement markings along numerous primary and secondary routes throughout Stafford County, including on Route 1 and Centreport Parkway.

Spotsylvania County


Route 17 Southbound

Thursday - Friday, 8 p.m. - 5 a.m. Flagging operation at the intersection of Route 608 for guardrail repair.

Caroline County



Route 1 Northbound and Southbound

Tuesday, Noon - 5 p.m. and Wednesday – Friday, 8 a.m. – 5 p.m. Pipe work on Route 1 with single lane closures near Ladysmith Road and Collins Boulevard.


Route 639 (Ladysmith Road) Major Traffic Shift

Tuesday, Noon - 5 p.m. and Wednesday – Friday, 8 a.m. – 5 p.m. Shoulder closures for construction. On Wednesday, May 31, all westbound traffic on Ladysmith Road between Green Road and Center Drive will be shifted to the future eastbound lanes. All eastbound traffic between Allen Street and Green Road will be shifted to the new road alignment to allow construction to continue on the widening project. Read the release here.


Secondary Road Resurfacing

Monday Tuesday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing. Flaggers will direct alternating one-way traffic in the work zone on the following secondary routes:


Route 601 (Hewlett Road)

Route 602 (Concord Road)

Route 604 (Blantons Road)

Route 604 (Gatewood Road)

Route 605 (Marye Road)

Route 618 (Alps Drive)

Route 640 (Smoots/Wrightsville Road)

Route 654 (Moores Mill Road)

Route 655 (McBryant Road)

Route 766 (Burma Road)

King George County


Route 3

Tuesday - Thursday, 7 p.m. - 5 a.m. and Wednesday - Friday, 9 a.m. - 3 p.m. Mobile work zone with single lane closures for overnight milling and paving between Route 205 and Route 301. Temporary pavement markers may be placed during daytime hours. Flaggers will direct drivers through the work zone.


Secondary Road Resurfacing

Tuesday Friday, 7 a.m. – 5 p.m. Mobile lane closures for road resurfacing. Flaggers will direct alternating one-way traffic in the work zone on the following secondary routes:


Canterbury subdivision

North Ridge Estates subdivision

Pinewood Acres subdivision

Route 655 (St. Paul's Road)

Wendover Square subdivision

Mathews County


Route 609 (Bethel Beach Road)

Wednesday – Friday, 7 a.m. – 7 p.m. Mobile lane closures for road resurfacing between Route 609 (Hamburger Road) and Route 270 (Bashi Shores Road).

Northumberland County


Secondary Road Resurfacing

Tuesday – Friday, 7 a.m. – 7 p.m. Mobile lane closures along the following routes as crews complete road resurfacing. Flagging crews will direct one-way, alternating traffic on the following routes:


Route 607 (Ditchley Road)

Route 652 (Gaskins Beach Road)

Route 669 (Kent Point Road/Prentice Creek Road/Bluff Point Road)

Route 802 (Tranquility Road)

Route 803 (Smith Point View)

Additional Projects in Fredericksburg District

 

Caroline County


Route 1 over South River Bridge Rehabilitation

Construction started in Feb. 2023 on a $4 million project to rehabilitate the Route 1 bridge over the South River, which is located in the Ladysmith area. The condition of the 97-year-old bridge will be improved through substructure and superstructure repairs, and installation of a new, smoother travel surface. Route 1 is reduced to two lanes to accelerate construction. All lanes will reopen in July 2024, when construction is anticipated to be complete.


Route 639 (Ladysmith Road) Widening

Construction is underway to widen Route 639 (Ladysmith Road) to four lanes between I-95 and just west of Route 1. A new raised median will separate eastbound and westbound lanes to allow for improved movement through the corridor. Additional left and right turn lanes will be built on Ladysmith Road at the Route 1 intersection. A shared use path, sidewalks, crosswalks, and pedestrian crossing equipment will be installed. The project is expected to be complete in May 2024.


Essex County


Route 612 (Bestland Road) Bridge Replacement Project

Route 612 (Bestland Road) is closed to through traffic through late June 2023 to replace a bridge over Dragon Run. The project is replacing the previous timber deck bridge with a new 48-foot concrete slab structure on concrete abutments and piles. Click here to view an online detour map.

King George County


Route 206 and Route 218 Turn Lane

This project is building a dedicated right turn lane from westbound Route 206 (Dahlgren Road) to westbound Route 218 (Caledon Road). The existing travel lane will be marked as a through lane to go straight or turn left onto Route 632 (St. Paul’s Road). The project will be complete in October 2023.


Route 301 and the Nice-Middleton Bridge Replacement Project

The new Nice/Middleton Bridge is now open to traffic over the Potomac River. Road work continues on Route 301 near the approaches. Read MDTA’s release here

King and Queen County and King William County


Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road and Spring Cottage Road are closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. The road will remain closed until further notice for an emergency bridge repair project. During a routine inspection, crews identified significant deterioration in key bridge elements, and the bridge was closed in March 2023 for motorist safety. Motorists should follow signs posted along the detour route.


Mathews County

 

Route 223 (Old Ferry Road) over Milford Haven at Gwynn's Island

Temporary traffic signals are installed on Route 223 at each approach to the bridge over Milford Haven. One-way, alternating traffic will remain in place, controlled by the temporary signals, through fall 2023 due to a bridge maintenance project. Bridge openings for marine traffic have resumed at six scheduled times a day.

Richmond County


Route 637 (County Bridge Road)

County Bridge Road is closed to through traffic at the bridge over Cat Point Creek due to damage following heavy rain and flooding in summer 2021. A bridge replacement is under construction. County Bridge Road will remain closed to through traffic until the new bridge reopens by April 26, 2024.


Spotsylvania County


I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

Construction is underway to build a second right turn lane from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic from side streets. Additional right turn lane added to Southpoint Parkway approaching Route 1. Project completion in August 2025. 


Route 1 and Market Street

Construction is underway to build triple left turns from westbound Market Street to Route 1 southbound, with a fourth lane on Market Street becoming a shared through/right turn lane. A shared through/right turn lane on Route 1 southbound at the intersection will tie into the I-95 northbound on-ramp at exit 126, south of the intersection. New sidewalks will be added along westbound Market Street, on Route 1 southbound, and along a short area on Route 1 northbound. Crosswalks will span Market Street and Route 1, controlled by pedestrian crossing signal equipment. Project completion in December 2023.


Route 1 and Commonwealth Drive

Be alert for construction activity on Route 1 near the Commonwealth Drive intersection, where work is underway to build a nearly 700-space Park & Ride commuter lot. Be alert for work zone barriers along the shoulders of Route 1, and for lanes shifted east near the Commonwealth Drive intersection. Project completion is anticipated in early June 2023.

 

Route 17 (Mills Drive) Overpass Replacement and Widening

Construction started in Dec. 2020 to replace the existing two-lane interstate overpass on Route 17 with a four-lane bridge. Route 17 will be widened to four lanes until just east of the Hospital Boulevard/Germanna Point Drive intersection. Sidewalk, a shared use path, and pedestrian crossing equipment will be added as part of the project. Improvements will be completed in Feb. 2024.


Route 208 (Courthouse Road) and Hood Drive

On Hood Drive, new right and left turn lanes are under construction at the U.S. Veterans Health Administration outpatient clinic under construction. Additional turn lanes will be built on northbound Hood Drive approaching Courthouse Road. A raised median on Hood Drive will separate northbound and southbound traffic between Courthouse Road and McGowan Drive. Additional sidewalks, crosswalks, and pedestrian crossing equipment will be installed at the intersection. Project completion in June 2024.


Route 606 (Mudd Tavern Road) Widening

Construction recently began to widen Mudd Tavern Road to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Route 606 (Mudd Tavern Road/Morris Road) is reduced to a single lane approaching the traffic signal at the Route 1 intersection through spring 2024 to allow space for widening activities. Project completion in May 2025.


Westmoreland County


Route 658 (Monroe Bay Circle)

Route 658 (Monroe Bay Circle) is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a replacement project is advanced. The road was closed to through traffic from late December 2022-March 2023 after a hole formed in the road, following a pipe failure at the crossing of Monroe Creek.


Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665. 


(END)


View as Webpage

Facebook  Twitter  Instagram