|
Join us for an exclusive behind-the-scenes tour
of the LDB manufacturing facility
—just ahead of MATRA Spring Training in Frederick, Maryland.
MARCH 30th
12pm - 5pm
See our extensive structure inventory, expansive vinyl fabrication, and first in class quality-controls. Meet the team, walk the production floor, and get a firsthand look at what sets Losberger De Boer apart.
Tours. Refreshments. Prizes. REAL INSIGHT.
|