Essential work that we have been able to do or are in the process of doing with the funds raised from the last 3 Thanksgiving Harvests:
PROJECTS COMPLETED
1. Electrical & HVAC engineer and structural engineer consultations and reports, – $13,425
2. Steel catwalk in boiler room for access to new location of upgraded church electric supply – $18,000
3. Essential upgrade of our electric supply in church from our present 200 amp service to a 800 amp service) into the church needed for HVAC work. (waiting for PSE&G to turn on power). This work was done in 3 stages with total cost of $60,000.
4. Replaced leaking roof in convent (emergency) - $14,000
5. Repaired parapet wall of convent - $2,500
6. Replaced rotten structural section of edge of the church roof (rectory side) and gutter (emergency) - $10,000.
For other church roof expenses see below.
(Total Spent thus far - $117,925)
PROJECTS IN PROGRESS (or bids still coming in):
1. HVAC split system package of four (exterior) condensers and 8 (interior) heads– $74,237 (This will be done in 4 stages, at a cost of $18,559.25 at each stage).
-Stages I & II (2 exterior condensers and 4 interior heads) – $37,118.50
2. Fencing to protect (exterior) condensers from vandalism & theft (approximate cost - $10,000)
3. Replace entire membrane on two sections of church roof and patch about 20 small holes in flat roof membrane – (approximate cost $10,000)
Total Additional expenses in 2022 (approximately) - $57,118.50.
Total (projected) Harvest Funds spent on major projects in the past 2 years (by the end of 2022) - $175,043.50
HVAC - Stages III & IV to be completed in 2023 with funds from the 2022 Thanksgiving Harvest – Please God. -$37,118.50