Meg Fogel, who is a co-chair of the Egleston task force, then walked us through the various investments Egleston Hall would need in order to bring the building up to current day code compliances, ranging from ADA access including the need for an elevator, increasing the number and accessibility of restrooms, energy compliance, lead and asbestos abatement, and other items.
The forum then noted that there are three main scenarios that the task force is studying:
- one that would preserve the Egleston building as it currently is
- another that would build an entirely new building on the site
- and a third that would be an adaptive reuse project that would preserve some of the existing building as well as engage in new construction.
There is a great deal of work still ahead of us to be able to arrive at a decision about which scenario to pursue. I know that in any kind of project like this there are people who are convinced that decisions have already been made. Given that we are dealing meticulously with the stewardship of this church that we treasure and the resources entrusted to us, nothing could be farther from the truth. This is incredibly painstaking and complex work. If we knew the answer to all this already we could save everyone a great deal of time and effort. To name what I have named before: no decision has been made.
The next steps for the task force are to continue to work with our architects, Perkins&Will, and our general contractor, Hodges & Hicks, to assess each of the above scenarios for Egleston, looking very carefully at how programming needs might work in each, as well as how each scenario might relate to existing buildings on the block, and what each would cost, testing those item by item to make sure they are as grounded in current and projected market conditions as possible.
Next up for the parish is the opportunity to join a tour of Egleston Hall on Sunday, April 26, led by members of the task force so people can see the condition of Egleston first-hand. I hope you can join. We will also be posting a video of the same so you can tour virtually.
As we go along in this process, we will be adding documents to the website. We want you to study with us and if you are interested in getting into more detail about some of the above, please do take a look at our document library on the church’s website: https://allsaintsatlanta.org/futureofourblock/.
Among those documents are:
- The powerpoint presentations made at the two most recent parish forums:
- Sunday March 22, 2026 led by Perkins and Will
- Sunday April 19, 2026 led by the Egleston task force and block development committee
-
The campus master plan approved by the vestry in 2025
-
The full campus assessment of our buildings and grounds carried out in 2019 by Wiss, Janney, Elstner Associates, Inc.
All of this careful and methodical work that is being carried out with regards to our buildings and grounds is important and necessary, and yet, we remain clear as a church about our vocation: that this is a place where life will thrive because of who we are as a faithful people of God. Our vision remains that All Saints’ will be a beacon of hope for the decades ahead of us because of our commitment to open new doors to the life we share here and to the hope we know in Christ Jesus. We have a profound gift as stewards of this church, let us open our doors wide for the world to receive it.
Peace,
|