1. Entry Water Features: The crew cleaned all the debris baskets and added chlorine shock to each feature.
2. Villages III: The crew collected trash from the lake and shoreline. We replaced a timer battery for the lights. The lights and timers are now functional and accurate. The fountain is running and flowing properly. The water level is normal.
3. Switchback: Trash and debris were collected. Fountain three that we recently repaired was tripped upon arrival. The motor passed our field diagnostic tests, so we reset it and will monitor its functionality. All three other fountains are running and flowing properly. The lights and timers are all functional and accurate. The outfall is clear of debris.
4. Willow Ranch: We collected trash from the lake and shoreline. The lights and timers are functional and accurate. We replaced the timer battery for the lights on fountain two. Both fountains are running and flowing properly. The outfall is clear of blockages. The water level is normal.
5. Nautical Point (Lake 4): The lights and timers are functional and accurate. The fountain is running and flowing properly. The crew collected trash and debris.
6. Nautical Point (Lake 5): The lights and timers are functional and accurate. The fountain is running and flowing properly. We collected trash from the lake and shoreline. The outfall is clear of blockages.
7. Mariner's Bay: We collected trash and debris. The lights and timers are functional and accurate. The timers on the North fountain were incorrect, so we adjusted them accordingly. Both fountains are running and flowing properly. The outfall is clear of blockages.
8. Additionally, we drove through to make sure all fountains on the Stone Gate side are running. The back fountain is Harmony Springs still has no incoming power. The Energy company will have to resolve this issue. Also, the proposal for the light set on lake 3 in Bluff Springs is pending approval. No other issues were detected while on site.
9. Replaced contact at the Splash Pad to get the A/C working.
10. Wrought iron fence at Switchback is completed. Sanded, primed, and painted 112’ to complete.
11. Monument next to the gas station Breaker to the lights was blown had to switch it back on checked made sure the photo cell was working everything back on order.
12. Bike racks at splash pad were rusted and changing colors. Sanded, primed, and painted it black.
Gates:
Canyon Green: Transcore was not working; power cycled transcore, transcore was now operational
Island shores: Remains open until repair
Stoney Falls: Transcore was not working; power cycled transcore, transcore operational
Mallory Bridge: Both gates stuck open, reset and ran tests loop indicators, gates are operational
Nautical Point: Cameras were offline and both gates were stuck open, no power to call box or cameras; powered on the surge protector and reset all systems, gate operational call box and cameras online
Nautical point: Batteries for exit primary operator was low, gate started opening and closing slowly; I changed the batteries and replaced terminal for dual battery connection, gate is operational
Keystone Fairway Hahns Peak: Gates were toggled open; flipped switch to close, entry gate didn’t close on account that the operator is leaning over and gate hits the exit gate and triggers the reversal; toggled entry gate open.
Willow ranch: Exit gate was stuck open, loops were triggered; reset the loop indicators, gate operational
Splash Pad: Card readers closest to splash pad office had no power, power source was off; Reset power supply and tested card readers, card readers operational
Switchback: Entry gate was toggled open; toggled gate closed, gate operational
|